| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 L
EMD Value
₹6,085
Closing Date
19 Jan 2024, 11:00 amClosed
Executive Engineer, Jal shakti(PHE) MRD, Sgr
Executive Engineer, Jal shakti(PHE) MRD, Sgr
Repairs to 100KVA and 50 KVA HT,LT Transformer at WSSs Zewan and Khonmoh 1st.
2024_PHE_242847_1
PHE/MRD/TS/141 of 01/2024
Open Tender
Miscellaneous Works
Item Rate
3 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Executive Engineer JSD PHE Mech Rural Division Sgr
₹6,085
Yes
25 Jan 2024
13 Jan 2024
19 Jan 2024
13 Jan 2024
19 Jan 2024
13 Jan 2024
Amount
Repairs to 50 KVA HT/LT Transformer with respect following works (6.6/1.1KV) at WSS Zewan
Transportation of damaged transformers from water supply scheme to contractors workshop, loading/unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load.
Providing / Fitting of HV winding (Aluminum) each weight coils 6.kg X 5 EACH.
Providing / Fitting of LV Winding (Aluminum) 02 No. LT.
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, and Kraft Paper.
Providing/applying of Paint of Tank as per IEE rules.
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube.
Providing/filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1 mm air gap.
Cost on account of Oil filtering to remove carbon content and other desired impurities.
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer.
Less by Cost of scrap windings (aluminum).
Repairs to 100 KVA HT/LT Transformer with respect following works (6.6/1.1KV) at WSS Khonmoh 1st.
Transportation of damaged transformers from water supply scheme to contractors workshop, loading/unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load.
Providing / Fitting of HV winding (Aluminum) each weight coils 8.kg X 5 EACH.
Providing / Fitting of LV Winding (Aluminum) 02 No. LT.
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, and Kraft Paper.
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Cost on account of Oil filtering to remove carbon content and other desired impurities.
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired 0 Transformer.
Less by Cost of scrap windings (aluminum).
M/S MUAZAM ELECTRICALS
Asif Engineering Works
M/s SAJID ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .