Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC MAIN CHOWK TABAB TILLO JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹1.4 L+₹4,750 (3.52%)Rejected-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹1.5 L+₹18,946 (14.0%)Rejected-Finance | L3 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
Closing Date
18 Jul 2022, 2:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer MID Jammu
Replacement of damaged parts and rewinding of 200 kva voltage stabilizer installed at lift irrigation station Kothey parlah old.
2022_IFC_178568_1
MID/J/e-NIT/2022-23/17
Open Tender
Repair and Maintenance Works
Item Wise
7 days
Kothey Parlah old
As per tender notice
7 documents required · 7 mandatory
₹200
EXECUTIVE ENGINEER MID JAMMU
Exempted
30 Sept 2022
9 Jul 2022
19 Jul 2022
9 Jul 2022
18 Jul 2022
12 Jul 2022
9 Jul 2022 - 18 Jul 2022
Replacement of damaged parts and rewinding of 200 kva voltage stabilizer installed at lift irrigation station Kothey parlah old by way of disconnecting incoming and outgoing power connections from voltage stabilizer. Draining of existing transformer oil in barrel. Dismantling of voltage stabilizer at workshop by way of extracting out the inner frame, extracting out the 3 No’s damaged coils and rotary switches. Rewinding of 3 No’s coils using standard quality copper wire of appropriate gauge, varnishing with two coats of standard make varnish and proper insulation. Replacement of gasket, providing/fitting of 3 no’s new rotary switches and refitting on the Bakelite plate. Filtration of existing transformer oil and toping up with 200 liters of fresh transformer oil after cleaning the tank to remove carbon deposits. Replacement of bus bars and internal control wiring at the incoming and outgoing of stabilizer as per ratting. Installation of the voltage stabilizer by connecting incoming and outgoing power cables. Testing of voltage stabilizer on no load and full load conditions. Job includes cost of material including rebate on old copper scrap/ material, labour charges, hire charges of tools and tackles, carriage charges, installation and testing charges at site.
Rebate on Old Parts
Rishabh Electricals and Mechanical Works
M/S NARESH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
GANPATI ELECTRICAL AND MECHANICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .