Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
29 Aug 2026, 5:00 pm6d left
Executive Engineer Killar Division HPPWD Killar
Executive Engineer Killar Division HPPWD Killar
Restoration of rain and snow damages on Alwas Killar road km 0/0 to 27/500 (SH Providing and Laying tack coat, bituminous macadam, bituminous concrete and applied hot thermoplastic road marking paint line between km 6/0 to 8/0 ) Under PDNA 2025
2026_PWD_141792_4
Killar-6202-12 dated 20-08-2026
Open Tender
Civil Works
Percentage
120 days
Killar
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,000
₹2.5 L
Yes
22 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing laying spreading and compacting stone aggregate of specific sizes to water bound Macadam,specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber applying and brooming ,crushed screening at the rate of 0.22 cum (zero point two two cubic metre) per ten square metre, to fill to fill up the interstices of course,aggregate watering and compating to the required density grading-III- 53 to 22.4 mm(fifty three millimetre to twenty two point four millimetre) sizes 75mm (seventy five millimetre compacted thickness as per MORD technical specifications clause No. 405 including hauling of material in all leads,lifts as per the entire satisfaction and direction of Engineer-in-charge including carriage of materials within all leads and lifts and other incidential. The rate including GST,octroi royality Malkhana toll tax sale tax or other taxes imposed by the Govenment | 527.62 | Per cubic metre | 6,085 | ₹32,10,567.7 |
| 2.01 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 to 1.20 kg/sqm using mechanical means as per Technical Specification Clause 502. and including hauling of material in all leads,lifts as per the entire satisfaction and direction of Engineer-in-charge including carriage of materials within all leads and lifts and other incidential. The rate including GST, octroi royality Malkhana toll tax sale tax or other taxes imposed by the Govenment | 6,405 | Per Square meter | 73.05 | ₹4,67,885.25 |
| 3.01 | Providing and applying tack coat with Bitument emulsion (RS-I) using emulsion pressure distributor at the rate of 0.30 to 0.40 kg. (zero point three zero to zero point four zero kilograms) per Square metre on the prepared bituminous surface cleaned with hydraulic broom as per M.O.R.D. technical specifications section No. 503 and including hauling of material in all leads,lifts as per the entire satisfaction and direction of Engineer-in-charge including carriage of materials within all leads and lifts and other incidential. The rate including GST, octroi royality Malkhana toll tax sale tax or other taxes imposed by the Govenment | 6,405 | Per Square meter | 37.25 | ₹2,38,586.25 |
| 4.01 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, VG-10 @ 3.30 % ( percentage by weight of total mix) transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. complete as per the entire satisfaction and direction of Engineer-in-charge including carriage of materials within all leads and lifts and other incidential. The rate including GST, octroi royality Malkhana toll tax sale tax or other taxes imposed by the Govenment | 320.25 | Per cubic metre | 12,872.75 | ₹41,22,498.19 |
| 5.01 | Providing and laying 30 mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder VG-10 @ 5.5% ( percentage by weight of total mix) and lime filler @ 2% ( percentage by weight of aggregate ) transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H specification Clause 509 complete in all respects. | 192.15 | Per cubic metre | 22,272.8 | ₹42,79,718.52 |
| 6.01 | Providing and laying of hot applied thermoplastic road marking paint compound 2.5mm (two point five millimetre) thick and 0.10 (zero point ten) metre wide strip in centre line including reflectorising glass beads @ 250 gms (two hundred fifty grams) per square metre area, thickness of 2.5 mm (two point five millimetre) is exclusive of surface applied a glass beads as per IRC 35 in accordance with Ministry of road Transport (Latest recision) and IRC code. The finished surface is to be level, uniform and free from streaks and holes including carriage of all labours equipment and materials to various location throught all modes of transporation in all leads, lifts and other incidental charges. | 400 | Per Square meter | 682.95 | ₹2,73,180 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
NIT.pdf
Tender Documents • 5.66 MB
BOQ_210498.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].