Loading…
Loading…
Tender Value
₹67.9 Cr
EMD Value
₹1.4 Cr
Closing Date
10 Aug 2026, 2:00 pm
SW-I: SA DIVN: Re-girdering of steel girders in Br.No.342 DN with new metallised steel girders on CV bridge at Km 388/200-700 between in SA-ED section. SW-II : SA Divn: JTJ-ED Sec: Proposed strengthening of Existing Arch Br.No.87 (18 x9.14m) DN line. SW-III : SA Division:- Proposed Rebuilding of minor bridges between JTJ-ED section in ADEN/S/SA Sub Division. ( 36 bridges)
SA-OT-07-2026-08
SA-OT-07-2026-08
Open
24 Months
Unknown (Unspecified Location)
₹0
₹1.4 Cr
3 Jul 2026
3 Jul 2026
27 Jul 2026
17 Jul 2026
'A3' applicable to SALEM DIVISION with all correction slips issued upto date -Including Cement.
SW-I:SA DIVN Regirdering of steel girders in Br.No.342 DN with new metallised steel girders on CV
bridge at Km 388/200-700 between in SA-ED section.
S No. Item No Description of Item Unit Qty Rate Amount
10.0 STEEL WORK
10.1S General
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
1 including nuts and washers
13.0 FINISHING
13.44S EXTERIOR FINISHING
13.50 Applying priming coat:
chromate primer of approved
brand and manufacture on steel
galvanised iron/ steel works
chromate primer of approved
brand and manufacture on steel
work (second coat)
Painting with aluminium paint of
13.63 approved brand and manufacture
to give an even shade .
15.0 DISMANTLING AND DEMOLISHING
15.1S General
by mechanical means in built up
sections without dismembering
and stacking within 50 metres
lead as per direction of Engineer-
15.20 Extra for dismantling trusses, kg per 106500 .85 90525
rafters, purlins etc. of steel work metre
6 for every additional span of one span
metre or part thereof beyond 10
15.21 Extra for dismantling trusses, kg per 106500 .85 90525
rafters, purlins etc. of steel work metre
7 for every additional height of one height
metre or part thereof beyond 5
8 steel work required to be re-
Item- 1 SW-II: SA Divn: JTJ-ED Sec: Proposed strengthening of Existing Arch Br.No.87 (18 x9.14m) DN line.
S No. Item No Description of Item Unit Qty Rate Amount
10.0 STEEL WORK
10.1S General
section, fixed with or without
connecting plate, including
1 cutting, hoisting, fixing in position
and applying a priming coat of
approved steel primer all
Steel work in built up tubular
(round, square or rectangular
hollow tubes etc.) trusses etc.,
including cutting, hoisting, fixing
10.16 in position and applying a priming
coat of approved steel primer,
including welding and bolted with
special shaped washers etc.
10.16.3 Electric resistance or induction Kg 7300 194.4 1419120
butt welded tubes
3 including nuts and washers
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
15.0 DISMANTLING AND DEMOLISHING
15.1S General
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material
within 50 metres lead as per
direction of Engineer - in - charge.
4 mix (including equivalent design
Demolishing brick work manually/
by mechanical means including
stacking of serviceable material
15.7 and disposal of unserviceable
material within 50 metres lead as
per direction of Engineer-in-
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
SW-III : SA Division:- Proposed Rebuilding of minor bridges between JTJ-ED section in ADEN/S/SA
subdivision. ( 36 bridges)
S No. Item No Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
2.1S General
Earth work in excavation by
mechanical means (Hydraulic
excavator)/manual means over
areas (exceeding 30 cm in depth,
2.6 1.5 m in width as well as 10 sqm
on plan) including getting out and
disposal of excavated earth lead
upto 50 m and for all lift, as
directed by Engineer-in-charge.
4.0 CONCRETE WORK
CEMENT CONCRETE (CAST IN
Providing and laying in position
cement concrete of specified
4.1 grade excluding the cost of
centering and shuttering - All work
up to plinth level :
(zone-III) derived from natural
aggregate 40 mm nominal size
derived from natural sources)
Centering and shuttering including
4.3 strutting, propping etc. and
removal of form work for :
4.14S MISCELLANEOUS
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Providing and laying in position
ready mixed or site batched
design mix cement concrete for
plain cement concrete work; using
coarse aggregate and fine
aggregate derived from natural
sources, Portland
Pozzolana/Ordinary Portland
/Portland Slag cement, admixtures
in recommended proportions as
4.20 per IS: 9103 to accelerate / retard
setting of concrete, to improve
durability and workability without
impairing strength; including
pumping of concrete to site of
laying, curing, carriage for all
leads; but excluding the cost of
centering, shuttering and finishing
as per direction of the engineer-
in-charge; for the following grades
4.20.1 All works upto plinth level :
4 minimum cement content of 270
10.0 STEEL WORK
10.1S General
bolted or welded in built up
sections, trusses and framed
5 work, including cutting, hoisting,
fixing in position and applying a
priming coat of approved steel
primer all complete.
6 round holding down bolts with
nuts and washer plates complete.
13.0 FINISHING
13.44S EXTERIOR FINISHING
13.50 Applying priming coat:
chromate primer of approved
brand and manufacture on steel
galvanised iron/ steel works
Painting with synthetic enamel
paint of approved brand and
manufacture to give an even
15.0 DISMANTLING AND DEMOLISHING
15.1S General
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material
within 50 metres lead as per
direction of Engineer - in - charge.
9 mix (including equivalent design
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
SALEM DIVISION-ENGINEERING/SOUTHERN RLY
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ANNEXUREIIIFORPOLICEVERIFICATION.pdf
ATTACHMENT
DetaileddescriptionofitemNo.15.pdf
ATTACHMENT
SPECIFICATIONFORBUILDINGSBRIDGEWORKSDEC2025.pdf
ATTACHMENT
TrackStandardDocument20122022.pdf
ATTACHMENT
RBCECEICTImplementationofContractoremb.pdf
ATTACHMENT
ANNEXUREVVAVIAVIB.pdf
ATTACHMENT
GCCApril2022NEW.pdf
ATTACHMENT
INSTRUCTIONSTOTHETENDERER.pdf
ATTACHMENT
ProcedureforLetterofCredit.pdf
ATTACHMENT
Workonhanddetails.pdf
ATTACHMENT
SafetyprecautionstobeadoptedwhileworkinginElectrifiedArea.pdf
ATTACHMENT
Splconditionsofcontractformovementofvehicle.pdf
ATTACHMENT
CheckListandNEFTform.pdf
ATTACHMENT
RlyBdletterClarificationofAnnexureV.pdf
ATTACHMENT
ACS1to10.pdf
ATTACHMENT
ACS112026_compressed.pdf
ATTACHMENT
NewFormatofBG.pdf
ATTACHMENT
SCCOFLUS.pdf
ATTACHMENT
Download all tender documents and submit your bid