Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 CrAccepted-AOC | ₹20.8 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹52.8 CrRejected-Finance | ₹52.8 Cr | L2 | Rejected-Finance Bidder is not L1 |
Tender Value
Refer Docs
Closing Date
27 Mar 2019, 5:00 pmClosed
LTHE
LTHE AdVENT Engineering Services 5th Floor TC1 Building Gate No 5 Powai Campus Saki Vihar Road Mumbai 400 072 INDIA
ETHANOL PRODUCTION PLANT FROM PSA OFF-GAS OF HYDROGEN GENERATION UNIT (U-76/77) AT PANIPAT REFINERY OF INDIAN OIL CORPORATION LIMITED
2018_REFHQ_89041_1
E1148-U05-SC-TD-063109
Limited
Mechanical - All
240 days
Please refer tender document
4 documents required · 4 mandatory
Exempted
LTHE, Mumbai
2 Jan 2020
1 Jan 2019
28 Mar 2019
1 Jan 2019
27 Mar 2019
15 Jan 2019
8 Jan 2019
Supply of TURBOFAN as per MR (E1148-U05-MR-MR-703202)
Customer Training at site (Note- 7 above) Per diem rate for Customer training
Hazop Participation (Note-8 above) Per diem rate
Supervision of erection, commissioning and testing (Note-9 above) Per diem charges (per person) for 8 hours work on normal working days (Monday to Saturday)
Supervision of erection, commissioning and testing (Note-9 above) Overtime rate/ hour beyond normal 8 hours work on normal working days.
Supervision of erection, commissioning and testing (Note-9 above) Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Mandatory spares as per Note-11
Bidder Name
Boldrocchi India Pvt. Ltd.
Howden Turbo GMBH
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Description of Work / Item(s)
Supply of TURBOFAN as per MR (E1148-U05-MR-MR-703202)
Customer Training at site (Note- 7 above) Per diem rate for Customer training
Hazop Participation (Note-8 above) Per diem rate
Supervision of erection, commissioning and testing (Note-9 above) Per diem charges (per person) for 8 hours work on normal working days (Monday to Saturday)
Supervision of erection, commissioning and testing (Note-9 above) Overtime rate/ hour beyond normal 8 hours work on normal working days.
Supervision of erection, commissioning and testing (Note-9 above) Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Mandatory spares as per Note-11
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid