Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.9 L
Closing Date
12 Nov 2026, 2:30 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Executive Engineer (O&M)Dn.-II, Raigarh
1. Estimate for replacement of burnt LT AB cable at various village under Kondatarai D/c. L53028250982 2. Estimate for replacement of burnt LT ab cable at village- Linjhir under Kondatarai D/c. L53028251023 3. Estimate for replacement of burnt LT ab cable at village- Karrajor under Kondatarai D/c. L53028251016
109086
NIT-13/ T-48 dt 22.10.2026
Chhattisgarh
23 Oct 2026
23 Oct 2026
12 Nov 2026
Name of work:- Estimate for replacement of burnt LT AB cable at various villages under Kondatarai D/c.
Sl. No. Name of Work Internal Order No. Provision Group NO Cost of Estimate Material Cost Excluding (cent.)GST Incidential Charges Labour Charges Transportation Charges Total Tender Amount CGST @9% On E SGST @9% On E Total Value of Tender Including GST
(A+B+C+D) (E+F+G)
Schedule Unit Estimate No A B C D E F G H
1 Estimate for replacement of burnt LT AB cable at various village under Kondatarai D/c. 0 11kv line km 0 L53028250982 dt- 30.03.2026 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Estimate for replacement of burnt LT ab cable at village- Linjhir under Kondatarai D/c. 0 11kv line km 0 L53028251023 dt- 30.03.2026 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Estimate for replacement of burnt LT ab cable at village- Karrajor under Kondatarai D/c. 0 11kv line km 0 L53028251016 dt- 30.03.2026 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LT LINE FOR MATERIAL BASE RATE Various village Linjhir Linjhir
SL. NO SHORT TEXT UNIT RATE QTY. AMOUNT QTY. AMOUNT QTY. AMOUNT
1 Suspension clamp assembly (consisting of GI Pole Clamp, GI Flat type I-hook & Nylon Cable tie). No 482.31 14.00 6752.27 8.00 3858.44 4.00 1929.22 569.12 11 mtr
2 Piercing connector suitable for 25/16 Sq.mm-50/35 Sqmm AB Cable-for street light No 82.31 21.00 1728.58 28.00 2304.78 12.00 987.76 97.13
3 Piercing connector suitable for 50/35 Sqmm AB Cable-Distribution Box (3 Nos. per 3 phase DB & 1 No. per 1 phase DB) No 107.23 19.00 2037.35 24.00 2573.49 8.00 857.83 126.53 `
4 Piercing connector suitable for AB Cable to AB Cable Tee connections. No 149.46 0.00 0.00 0.00 0.00 0.00 0.00 176.36
5 UDC- Universal Distribution Connector No 134.70 18.00 2424.66 24.00 3232.88 6.00 808.22 158.95
Cost of Material 76481.44 179634.69 58938.35 #REF! #REF! #REF!
Incidential Charges 0.075 5736.11 0.075 13472.60 0.075 4420.38 #REF!
Total Material cost 82217.55 193107.29 63358.73 #REF!
LT LINE FOR SERVICE
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
4 Dismetalling of overhead cable no 5183.57 0.800 4146.86 1.215 6298.04 0.400 2073.43
5 Transportation Charges No 0.00 0.02 1529.63 0.02 3592.69 0.02 1178.77
Total M+S Tender Amount 98382.52 223126.12 73237.46
Company Supplied Material
SL NO SHORT TEXT UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT
1 Insulated wire/cable aluminium scrap kg 103.13 -185.20 -19099.68 -325.45 -33563.66 -155.10 -15995.46
3 Xmer 25 KVA 11/0.4 KV energy efficency level2 No 26697.00 0.00 0.00 0.00 0.00 0.00 0.00
SUPERVISION CHARGES FOR ESTIMATE 0.00 0.00 0.00
OVERHEAD CHARGES 15627.46 34180.71 11381.02
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.01 MB
261900-NIT_TD109086.pdf
pdf • 0.61 MB
261901-BOQ_TD109086.xlsx
xlsx • 0.04 MB
261902-TENDER_DOC_TD109086.pdf
pdf • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .