Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GUDLIXA | Admitted-Finance |
Tender Value
₹20.1 L
EMD Value
₹40,160
Closing Date
22 Feb 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Senior Regional Manager
Senior Regional Manager RIICO Ltd EPIP Sitapura
Preparation and distribution of water bills of all Industrial Areas under jurisdiction of Unit EPIP Sitapura Jaipur
2022_RIICO_258613_1
50/EPIPsitapura/2021-22/2379/4
Open Tender
Civil Works
Item Rate
730 days
Industrial Areas under jurisdiction of Unit EPIP S
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
RIICO LTD
₹40,160
28 Feb 2022
11 Feb 2022
24 Feb 2022
11 Feb 2022
22 Feb 2022
11 Feb 2022
90 days
Amount
Labour charges of releasing new water connections from distribution system of different sizes 1/2" & above including digging for pipeline, making hole in pipeline, fixing clamp on pipeline and fixing of ferrule with G.I. Pipe for release of a new water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges of making water connection D.C. or R.C. from distribution system of different sizes. 1/2" & onwards including digging for pipeline, making hole/ plugging hole in pipeline, removal or fixing of ferrule with G.I. Pipe for R.C or D.C. water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges for Removing / Refixing / Replacement of water meter for repairing, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges for crossing the water connection pipe under the road crust by manual / mechanical means, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges for dismantling of cement concrete/ RCC Platform for making new connection /D.C./ R.C. at site, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges of checking water connections at connection point from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and aligning of ferrule with G.I. Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and alignment of ferrule with G.I. Pipe if any found at site and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge.
Preparation and distribution and updation of monthly water TheScope of Work includes 1. Taking water meter reading preparationof water consumption bills through Water Billing Module of RIICOERP software in prescribed format on monthly basis .2.Distribution of prepared water consumption bills through waterbilling module of RIICO ERP once in 2 months. 3. The work ofupdation of monthly ledger posting of issued bills, deposited bills(recovery or realization), preparation of monthly outstanding dueslist, preparation of Defective or Stopped meter list, andpreparation of duplicate water bills.4. The work of processing andupdation of all types of permission applications received forworks related to Water Billing Module (WBM) like new waterconnections or Disconnections or ReConnections or Replacementof Water Meter or Change of Name, Size etc. and other alliedworks related to WBM.5. The work of updation of New Bindersand Ledgers for each financial year. Preparation of Water duesbalance sheet and reconciliation of water dues recovery withfinancial ledger. The scope include providing services withrequisite manpower and all leviable Central or State taxes,transportation etc. complete as per the direction of Engineer inCharge.Only New Binders, Ledgers and stationery for water billprinting related to water connections for each financial year shallbe provided by the corporation.
Pawan Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .