| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -1.12% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹1.3 L (1.03%)Admitted-Finance | -0.10% | ₹1.3 Cr+₹1.3 L (1.03%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical not filfil Eligibility Criteria |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-not submit dd and fd |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-not submit DD and FDR |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
14 Feb 2026, 12:00 pmClosed
VC ADA
ramghat road aligarh
Transport Nagar Scheme filling of soil on both sides of 45 meter Atal Marg (between Sector 08 and 09) and 24 meter Road Shivaji Marg painting of the constructed divider and construction of drain on both sides of 45 meter Atal Marg
2026_ALIDA_1111736_1
5773
Open Tender
Civil Works
Percentage
aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹22,500
Yes
VC ADA
₹2.5 L
Yes
6 Mar 2026
3 Feb 2026
14 Feb 2026
3 Feb 2026
14 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EXCAVATION in foundation in ordinary Soil ( Loam, clay or sand ) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by the Engineer-In-Charge upto a distance of 30 m.from foundation trenches by hydraulic excavator/manual means. For building/drain work only | - | Cum | - | - |
| 2 | Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work. in Foundation and floors. | - | cum | - | - |
| 3 | Providing & Laying in position specified grade of reinforced cement concrete, with 1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) including the cost of centering, shuttering, finishing and excluding reinforcement . All work upto plinth level | - | Cum | - | - |
| 4 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering shuttering, finishing and excluding reinforcement .1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) upto plinth level | - | Cum | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | - | Qtl | - | - |
| 6 | Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no, 300-2 Carted earth 8 km. As per MORTH Specification 305/SI No 3.18 | - | Cum | - | - |
| 7 | Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surface
to prepare the surface even and smooth complete. DSR-2023 SI No 13.80 | - | Sqm | - | - |
| 8 | Providing & Laying in position specified grade of reinforced cement concrete, with 1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) including the cost of centering, shuttering, finishing and excluding reinforcement . All work upto plinth level SI No 5.1.2 (a) UPPWD SOR 2022 FOOTING | - | Cum | - | - |
| 9 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering, shuttering, finishing and excluding reinforcement .1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) above plinth level upto fifth floor level SI No 5.2.2 (a) UPPWD SOR 2022 (COLUMN) | - | Cum | - | - |
| 10 | R C C work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. Including the cost of centering, shuttering, finishing and excluding reinforcement .1:1.5:3 (1 Cement :1.5 Coarse Sand : 3 graded stone aggregate 20mm nominal size) above plinth level upto fifth floor level SI No 5.2.2 (a) UPPWD SOR 2022 BEAM | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
DOC_RFP.pdf
Tender Documents • 9.37 MB
BOQ_2055179.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .