Tender Value
₹85.1 L
EMD Value
₹86,000
Closing Date
9 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Joint Director/Project Director
DRDA, PUDUKKOTTAI
TNRRIS -20-21 - PACKAGE NO. 06 - AVUDAIYARKOIL BLOCK (BLOCK LEVEL) IN PUDUKKOTTAI DISTRICT
2020_RDTN_181174_1
Package 06 - Avudaiyarkoil Block - TNRRIS 20-21
Open Tender
Civil Works
Item Rate
180 days
Pudukkottai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹86,000
21 Oct 2020
24 Sept 2020
9 Oct 2020
24 Sept 2020
9 Oct 2020
24 Sept 2020
90 days
Amount
Strengthening to the road From Muthuvalarkudi Road ( km 0/0 - 1/400) in Kunnur Panchayat.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately
Provision for HM stones (size 0.90x0.15x0.15)
Provision for KM stones (size 1.65 x0.45 x0.15)
Strengthening to the road From Sadayamangalam Road ( km 0/0 - 1/0) in Kathiramangalam Panchayat.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately
Provision for HM stones (size 0.90x0.15x0.15)
Provision for KM stones (size 1.65 x0.45 x0.15)
Provision for Construction of RCC 1.50 M Span Culvert
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Below Sill Level
Above Sill Level
Supplying and Fabrication of Steel roads including all cost and Conveyance and all labour chrges and all other incidental charges
R.C.C 1:1.5:3 mix using 20mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
CC 1:2:4 mix using 20mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Strengthening to the road From Puthambur Kanmaikarai Road ( km 0/0 - 1/0) in Puthambur Panchayat.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately
Provision for HM stones (size 0.90x0.15x0.15)
Provision for KM stones (size 1.65 x0.45 x0.15)
Provision for Construction of Pipe Culvert
Earth work excavation and Depositing on sides with initial lead and lift in hard graually soil as per SS 20b for Foundation
Filling With Good River Sand including cost and Conveyance of All charges and etc completed
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1 : 3 : 6 mix using 40mm HBG metal including cost and Conveyance of all materials to site including all labour charges for filling etc complete
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc,, completed
Above Sill Level
Supplying and Fixing of RCC Pipe 600mm Dia (NP3)
Supplying and filling with collected Gravel including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PL R AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .