Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
19 Jun 2026, 4:00 pm5d left
Executive Engineer
Irrigation Division Shopian
Restoration of Arahama Khul b/o Natoo canal by way of construction of lining wall near the orchard land of Gh. Ahmad Pandit and others
2026_IFC_312337_1
Fresh eNIT 07 of 2026-27
Open Tender
Civil Works
Shopian
Refer to tendered documents
2 documents required · 2 mandatory
₹100
Executive Engineer
₹2,000
13 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 53.16 | Cum | 187.3 | ₹9,956.87 | BI01010001010000000000000515BI0100001113 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 1.22 | Cum | 237.9 | ₹290.24 | BI01010001010000000000000515BI0100001114 |
| 3 | Supply of Stone boulder nominal size 225 mm | 1.22 | Cum | 700 | ₹854 | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.74 | Cum | 6,591.25 | ₹64,198.78 | BI01010001010000000000000515BI0100001116 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 45.84 | sqm | 286.35 | ₹13,126.28 | BI01010001010000000000000515BI0100001117 |
| 6 | Carriage of material by Mechanical Transport .
Stone boulders Avg. lead of 3kms from Rambiara | 1.22 | Cum | 195.1 | ₹238.02 | BI01010001010000000000000515BI0100001118 |
| 6.01 | 20 mm agg. Avg. lead of 13kms from Narapora | 8.77 | Cum | 318.31 | ₹2,791.58 | BI01010001010000000000000515BI0100001119 |
| 6.02 | Sand Avg. lead of 30kms from Kakapora | 4.38 | Cum | 520.34 | ₹2,279.09 | BI01010001010000000000000515BI0100001120 |
| 6.03 | Cement avg. lead of 02 kms from Shopian | 3.12 | MT | 131.06 | ₹408.91 | BI01010001010000000000000515BI0100001116 |
| 7 | Extra carrriage of Materails by Head Load of 250 M
Boulders | 1.22 | Cum | 441.68 | ₹538.85 | BI01010001010000000000000515BI0100001117 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1010993.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid