Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,341.50Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹99,341.50 | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
19 Jun 2026, 4:00 pmClosed
Executive Engineer
Irrigation Division Shopian
Restoration of Arahama Khul b/o Natoo canal by way of construction of lining wall near the orchard land of Gh. Ahmad Pandit and others
2026_IFC_312337_1
Fresh eNIT 07 of 2026-27
Open Tender
Civil Works
Percentage
Shopian
Refer to tendered documents
2 documents required · 2 mandatory
₹100
Executive Engineer
₹2,000
9 Jul 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 53.16 | Cum | 187.3 | ₹9,956.87 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 1.22 | Cum | 237.9 | ₹290.24 |
| 3 | Supply of Stone boulder nominal size 225 mm | 1.22 | Cum | 700 | ₹854 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.74 | Cum | 6,591.25 | ₹64,198.78 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 45.84 | sqm | 286.35 | ₹13,126.28 |
| 6 | Carriage of material by Mechanical Transport .
Stone boulders Avg. lead of 3kms from Rambiara | 1.22 | Cum | 195.1 | ₹238.02 |
| 6.01 | 20 mm agg. Avg. lead of 13kms from Narapora | 8.77 | Cum | 318.31 | ₹2,791.58 |
| 6.02 | Sand Avg. lead of 30kms from Kakapora | 4.38 | Cum | 520.34 | ₹2,279.09 |
| 6.03 | Cement avg. lead of 02 kms from Shopian | 3.12 | MT | 131.06 | ₹408.91 |
| 7 | Extra carrriage of Materails by Head Load of 250 M
Boulders | 1.22 | Cum | 441.68 | ₹538.85 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1010993.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .