Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
1 Jul 2022, 2:00 pmClosed
SE/MEDC/Mettur
o/o SE/MEDC/Mettur
Work contract for laying HT LTOH lines for RDSS SCHEME HVDS 11KV Sengattur Feederin Mecheri subdivision in Meuttur division
2022_EB_236541_1
SE/MEDC/RDSSWC/SpecNO 010/22-23
Open Tender
Electrical Works
Works
270 days
SE/MEDC/Mettur Dam
EMD and documents as per BQR condition
2 documents required · 2 mandatory
₹0
₹42,000
7 Jul 2022
18 Jun 2022
2 Jul 2022
18 Jun 2022
1 Jul 2022
18 Jun 2022
18 Jun 2022 - 1 Jul 2022
Amount
Work contract schedule
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Excavation of Stay pit 4.5'to 5 depth using JCb or manual
Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
Erection of Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or maual
Erection of stay set complete
Fixing HT/LT TI fitting
Fixing HT V cross arms{all type)
Fixing of HT 11KV strain Disc
Fixing of 11 kv HT pin insulator
Fixing of LT Pin insulator
Fixing of aluminium knob
Fixing of LT shackle
Fixing of LT 3 ph Xarm
Painting of metal poles including X arm( Excluding cost of paint )
Painting of RCC/PSC Poles
Stay concreting including cost of materials and Labour 375mmX375mmX50mm
Numbering of Pole with paint and with base painting
Sleeve concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering) 5'x2'x2'
Earthing pole with pin and cross arm
paving of conductor and stringing with ACSR 7/3.35mm ,AAAC 7/3.15mm
Transport of Poles /Materials /Conductor and other materials (excluding loading and un loading) below 8 kms
Above 8kms for additional km(Irrespective of weight in Tonage)
Loading of pole above 8.0m
Loading of pole metal poles(all size)
UnLoading of pole above 8.0m
UnLoading of pole metal poles(all size)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual upto 100 m
Loading and unloading of material
Dismantling of Conductor ACSR 7/3.35mm
Dismantling of Conductor ACSR 7/4.09 mm
Removing of aluminium knob
Removing of LT Three phase Xarm
Removing of LT pin insulator
Removing of LT Shackle
Tree cutting
Erection of street light service
Erection of DP Structure complete with AB switch,top channel,cross bracing,earthing,painting,providing stay including concreting
Erection of HVDS Transformer structure complete ( Single pole mounted) in all respects with wiring ,Earthing ,fixing of open type fuse units ,HT/LT LAS and Jumpering 3nos Earth pit with Collar including painting of metal parts ,Structure poles ,fixing of tapping channel,transformer beed structure including concreting (except erection of Transformer)
Erection of DT
Loading and unloading of DT
Dismantling charges of Transformer
Dismantling charges of Transformer
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .