| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 29 PEDLIGANJ THANA CANTT GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹2.0 Cr | L1 | Accepted-AOC AS UPLOADED |
| 2 | L2₹2.1 CrRejected-AOC | ₹2.1 Cr | L2 | Rejected-AOC AS UPLOADED |
| 3 | L3₹2.1 CrRejected-AOC | ₹2.1 Cr | L3 | Rejected-AOC AS UPLOADED |
| 4 | L4₹2.1 CrRejected-AOC | ₹2.1 Cr | L4 | Rejected-AOC AS UPLOADED |
| 5 | L5₹2.2 CrRejected-AOC RAMSEWAKPURAM COLONY HARIHAR PUR NILMAYA SAROJININAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹2.2 Cr | L5 | Rejected-AOC AS UPLOADED |
| Sl No | Description | Qty | Unit | M/S K.K. TRADERS L9 | M/S OBELION CONSTRUCTIONS L3 | M/s AWADH ASSOCIATES L1 | M/S BHAGWATI TRADERS L11 | M/s Shrinet Traders L4 | M/S AADI SHAKTI TRADERS L8 | DILIP KUMAR YADAV L10 | MS YADAV AND SONS L7 | RAM NARAYAN YADAV L6 | M/s Rai Construction L5 | M/S GYAN PRAKASH L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in Excavation with rough dressing with initials lead of 30m & lift up to 1.50m for flood work as per directed by Engineer in charge. | 5,821.88 | Cum | 69.99 ₹4.1 L | 46.6 ₹2.7 L | 46 ₹2.7 L | 60 ₹3.5 L | 58 ₹3.4 L | 32 ₹1.9 L | 44 ₹2.6 L | 55 ₹3.2 L | 35 ₹2.0 L | 40 ₹2.3 L | 39 ₹2.3 L |
| 1.02 | Providing & Laying of R.C.C Porcupine with 6 no RCC members of Size 3.0x0.10x0.10m with C.C. (1:1.5:3) by crussed stone grit 10-12.50mm and course sand of FM more than 2 and Tor steel as per drawing , filled with jhakhar including cost of all material, labour, carriage, T&P etc with all porcupine tagged to each other by 8 SWG G.I. wire complete for proper completion of work as per direction of Engineer Incharge. | 3,090 | Set | 7,549.99 ₹2.3 Cr | 6,599 ₹2.0 Cr | 6,379 ₹2.0 Cr | 8,800 ₹2.7 Cr | 6,499 ₹2.0 Cr | 7,360 ₹2.3 Cr | 7,848 ₹2.4 Cr | 7,000 ₹2.2 Cr | 6,950 ₹2.1 Cr | 6,850 ₹2.1 Cr | 6,500 ₹2.0 Cr |
| 1.03 | Providing and fixing of Bamboo bracing 5cm to 8cm dia braced at top and bottom as per drawing including cost of all materials, carriage, labour T&P etc. required for proper completion of work as per direction of Engineer in-Charge. | 13,650 | R.M. | 59.99 ₹8.2 L | 43.26 ₹5.9 L | 30 ₹4.1 L | 108 ₹14.7 L | 65 ₹8.9 L | 32 ₹4.4 L | 48 ₹6.6 L | 42 ₹5.7 L | 30 ₹4.1 L | 45 ₹6.1 L | 29 ₹4.0 L |
| 1.04 | Providing & Placing Bamboo Khunta & tieing RCC Porcupines at a interval of 20m C/C with all cost complete for proper completion of work. required for proper completion of work as per direction of Engineer in-Charge. | 30 | Nos. | 90.99 ₹2,729.70 | 209.15 ₹6,274.50 | 168.5 ₹5,055 | 130 ₹3,900 | 288 ₹8,640 | 295 ₹8,850 | 298 ₹8,940 | 300 ₹9,000 | 330 ₹9,900 | 200 ₹6,000 | 299 ₹8,970 |
Tender Value
Refer Docs
EMD Value
₹7 L
Closing Date
13 Apr 2026, 11:00 amClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, GANDAK IRRIGATION WORKS CIRCLE-2, GORAKHPUR(U.P)
The Work Of Laying 05 Rows RCC Porcupine In Grid Pattern On The River Bank Between Km 3.900 To Km 4.150 And Km 4.900 To Km 5.140 Of Chitouni Bund Located On The Right Bank Of The Great Gandak River In Kushinagar District.
2026_UPIDC_1134218_1
01/SE/2026-27
Open Tender
Civil Works
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,821
₹7 L
GORAKHPUR
18 Apr 2026
8 Apr 2026
13 Apr 2026
8 Apr 2026
13 Apr 2026
8 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Earth work in Excavation with rough dressing with initials lead of 30m & lift up to 1.50m for flood work as per directed by Engineer in charge. | - | Cum | - | - | BI01010001010000000000000515BI0100001113 | |
Providing & Laying of R.C.C Porcupine with 6 no RCC members of Size 3.0x0.10x0.10m with C.C. (1:1.5:3) by crussed stone grit 10-12.50mm and course sand of FM more than 2 and Tor steel as per drawing , filled with jhakhar including cost of all material, labour, carriage, T&P etc with all porcupine tagged to each other by 8 SWG G.I. wire complete for proper completion of work as per direction of Engineer Incharge. | - | Set | - | - | BI01010001010000000000000515BI0100001114 | |
Providing and fixing of Bamboo bracing 5cm to 8cm dia braced at top and bottom as per drawing including cost of all materials, carriage, labour T&P etc. required for proper completion of work as per direction of Engineer in-Charge. | - | R.M. | - | - | BI01010001010000000000000515BI0100001115 | |
Providing & Placing Bamboo Khunta & tieing RCC Porcupines at a interval of 20m C/C with all cost complete for proper completion of work. required for proper completion of work as per direction of Engineer in-Charge. | - | Nos. | - | - | BI01010001010000000000000515BI0100001116 |
stage.html
html • 0.07 MB
techsummary_2117335.pdf
BOQ Comparative Chart
xlsx
finsummary_2117335.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.39 MB
1.pdf
Tender Documents • 1.87 MB
BOQ_2117335.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid