| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹4.6 Cr | L1 | Accepted-AOC as per rate |
| 2 | L2₹4.8 Cr+₹21.2 L (4.64%)Rejected-Finance 2 2 LAXMI NAGAR SUPELA BHILAI DURG CHHATTISGARH 490023 UDYAM CG 05 0000169 | DURG | CHHATTISGARH | 490023 | ₹4.8 Cr+₹21.2 L (4.64%) | L2 | Rejected-Finance AS PER RATE |
| 3 | L3₹5.0 Cr+₹43.5 L (9.52%)Rejected-Finance | ₹5.0 Cr+₹43.5 L (9.52%) | L3 | Rejected-Finance AS PER RATE |
| 4 | L4₹5.0 Cr+₹45.4 L (9.93%)Rejected-Finance 302 1 SHIVKUTI PRAYAGRAJ | ₹5.0 Cr+₹45.4 L (9.93%) | L4 | Rejected-Finance AS PER RATE |
Tender Value
₹6.1 Cr
EMD Value
₹12 L
Closing Date
13 Sept 2023, 3:00 pmClosed
S.E., PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
S.E., PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
Strengthening of Someswar Mahadev Devrakh Sodiyabheet road
2023_CEALD_834778_1
3089/10COM.P-PRJ.CIRCLE/23 DATED 25.07.2023
Open Tender
Civil Works - Roads
Item Rate
270 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹12 L
Yes
31 Oct 2023
5 Sept 2023
13 Sept 2023
5 Sept 2023
13 Sept 2023
5 Sept 2023
Amount
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Analysis of Rate for Stablized (Type-2) Providing, laying, soreading and compacting graded stone aggregate to wet mix macadam with 3.5% Emulsion and 1% cement specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Dense Graded Bituminous Macadam Grading 2 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Tack coat Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Bituminous Concrete Providing and laying bituminous concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing with Grade of Concrete M-35
Providing and Laying Interlocking Concret Block Pavement having thickness 80 mm as per drawing and Technical Specifiaction Clause 1500 of MORD Specification.
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone masonary.Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.
R.C.C. grade M 20 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump
Reinforcement work(Substructure) Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Pointing Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600 mm
Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 900 mm
M/S J.P. Construction
M/S SURESH KUMAR SINGH
M/s Vinod Kumar Pandey
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .