Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.2 CrAccepted-AOC 144 GRAM POST JHIRIYA KOPARIHAN TOLA TEHSIL RAMPUR BAGHELAN DIST SATNA MP | SATNA | MADHYA PRADESH | 485001 | ₹8.2 Cr | 1 | Accepted-AOC RATES APPROVED BY PROCUREMENT CELL COMITTEE |
| 2 | 2₹8.5 Cr+₹32.1 L (3.93%)Rejected-AOC | ₹8.5 Cr+₹32.1 L (3.93%) | 2 | Rejected-AOC BIDDER IS L2 |
| 3 | 3₹9.5 Cr+₹1.3 Cr (16.3%)Rejected-AOC | ₹9.5 Cr+₹1.3 Cr (16.3%) | 3 | Rejected-AOC BIDDER IS L3 |
Tender Value
₹8.7 Cr
EMD Value
₹8.7 L
Closing Date
28 Nov 2020, 5:30 pmClosed
SUPERINTENDING ENGINEER PROCUREMENT CELL INDORE ZO
CE OFFICE PHED INDORE ZONE TUKOGANJ INDORE
Design, Construction and Retrofitting of Group Piped Water Supply Scheme under Jal Jeevan Mission at Village - 1. Malipura 2. Aamkho Block Nalcha Distt. Dharbased on Tube wells
2020_PHED_114196_1
NIT No 20/Pro Cell/ CE/PHED/2020-21/ Indore
Open Tender
Civil Works - Water Works
Percentage
180 days
dhar
as per NIT
3 documents required · 3 mandatory
₹20,000
₹8.7 L
7 Mar 2021
13 Nov 2020
1 Dec 2020
13 Nov 2020
28 Nov 2020
13 Nov 2020
13 Nov 2020 - 13 Nov 2020
eProcurement System Government of Madhya Pradesh Created By: RAJENDRA MAITHIL Created Date/Time: 22-Dec-2020 01:45 PM Tender Title: RETROFITTING OF PWSS Tender ID: 2020_PHED_114196_1
Tender Inviting Authority: Superintending Engineer (Procurement) O/o the Chief Engineer P.H.E. Indore Zone Indore for Member Secreaty, District Water and Sanitation Mission and Executive Engineer PHE Division Dhar District Dhar
Name of Work: Design, Construction and Retrofitting of Group Piped Water Supply Scheme under Jal Jeevan Mission at Village - 1. Malipura 2. Aamkho Block Nalcha Distt. Dharbased on Tube wells including installation of electric submersible/centrifugal water motor pumps, Construction of 06 Nos. R.C.C. Overhead tanks (01 Nos.-50KL/12M, 01 No.- 75KL/12M,2 No.-100KL/12M, 1 No.-100KL/15M, 1 No.-125KL/12M), 06 Nos. sumpwells (02No.- 20KL,02No.- 30KL,01No.- 40KL and 01No.- 75KL), pump houses, laying and jointing of rising main, distribution pipe line system, household tap connections, electric power connections at Tube wells including cost of all material and labour with testing commissioning thereafter 90 Days Trial Run of entire scheme
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 m/s surana fabricators (india)(GSTN-23AAKFS9914K1ZQ) 86502974.989 -1.800 84945921.450 Eight Crore Fourty Nine Lakh Fourty Five Thousand Nine Hundred and Twenty One
2.00 Shree Construction(GSTN-23ADXFS0919E1ZX) 86502974.989 -5.510 81736661.078 Eight Crore Seventeen Lakh Thirty Six Thousand Six Hundred and Sixty One
3.00 ARIHANT CONSTRUCTIONS(GSTN-23AACFA1166D1Z7) 86502974.989 9.900 95066769.525 Nine Crore Fifty Lakh Sixty Six Thousand Seven Hundred and Sixty Nine
Lowest Amount Quoted BY: Shree Construction(81736661.078)
BOQ Summary Details Tender Title: RETROFITTING OF PWSS Tender ID: 2020_PHED_114196_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Shree Construction 81736661.078 L1
2 m/s surana fabricators (india) 84945921.450 L2
3 ARIHANT CONSTRUCTIONS 95066769.525 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .