Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC 75 ELECTRONICS ESTATE PERUNGUDI CHENNAI TAMIL NADU 600096 | CHENNAI | TAMIL NADU | 600096 | L1 | Accepted-AOC L1 RATE ACCEPTED | |
| 2 | L2₹3.5 L+₹16,225 (4.89%)Rejected-Finance 38 5 8 1ST MAIN ROAD 2ND STAGE INDUSTRIAL SUBURB YESHAWANTHPURA BANGALORE KARNATAKA 560022 | BENGALURU URBAN | KARNATAKA | 560022 | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹3.8 L+₹45,725 (13.8%)Rejected-Finance | L3 | Rejected-Finance REJECTED | |
| 4 | Rejected-Technical | - | Rejected-Technical REJECTED |
Tender Value
Refer Docs
Closing Date
4 Mar 2020, 10:00 amClosed
PRINCIPAL
GCE SENGIPATTI GANDARVAKKOTTAI ROAD
PURCHASE OF SOLAR PV MODULE TRAINING KIT -EEE DEPT
2020_DoTE_158597_1
GCE/TNJ/0531-EEE/A3/2020
Open Tender
Electrical Goods/Equipments
Supply
7 days
GCE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
20 Mar 2020
20 Feb 2020
5 Mar 2020
20 Feb 2020
4 Mar 2020
20 Feb 2020
Solar PV module Training kit
i. Experimental Panel • Inverter module (1Ф,1000W) Single Phase OFF Grid • Inverter module (1Ф,1000W) Single Phase ON Grid • Charge controller module (MPPT) • Battery(12V/100AH) • AC Lamp load • Resistive Load – Rheostat • Panel meters Stickered powder coated frame with stand to fix all the (1 to 7) items for experimental setup. Inverter [OFF GRID] * Inverter [ON GRID] Input 20V to 45V DC. # Input 230V to 45V DC Output 220VAC/1000W (max) # Output: 230VAC/1000W (Max) 1. Charge controller MPPT method. All terminals are terminated with banana connector. Battery Rating 12V/100AH. Maintenance free. AC Load with 10 Switches 10 Nos of 60W Lamp with holders. 10 Nos of SPDT 5A switches ON/OFF. Panel Meter Panel meter is used to read all the input and output current and voltages in different places. Analog Voltmeter. - 3Nos (solar/battery/ inverter Voltage) Analog Ammeter. - 3Nos (solar/battery/ inverter Current) ii. Solar Panel with stand Solar panel -1000W. Mechanical setup • Setup is provided to fix the solar panel sunlight which is fall on solar panel. • Fixed solar panel arrangement. • Direct sunlight needed (Outdoor solar panel) • Shading arrangement for one panel
Prudent Communication Systems Pvt Ltd
VERSABYTE DATA SYSTEMS PVT LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .