| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC Being Ist lowest and completed all required paper formalities and ready to do work. |
| 2 | L2₹16.1 LRejected-Finance | ₹16.1 L | L2 | Rejected-Finance HIGHER BID |
| Sl No | Description | Qty | Unit | DHARIWAL CONSTRUCTION L2 | SUNSHINE ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge | 398.47 | M3 | 80 ₹31,877.26 | 80 ₹31,877.26 |
| 2.00 | Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 47.45 | M3 | 5,580 ₹2.6 L | 5,450 ₹2.6 L |
| 3.00 | Supplying and filling boulder 20-40 kg. in apron with cost of all material including all cost of labour,material and T & P etc. complete | 5.71 | M3 | 2,502 ₹14,287.67 | 2,502 ₹14,287.67 |
| 4.00 | Laying R.C.C. M-20 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 66.5 | M3 | 6,130 ₹4.1 L | 6,130 ₹4.1 L |
| 5.00 | Laying R.C.C. M-25 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 23.71 | M3 | 7,064 ₹1.7 L | 7,064 ₹1.7 L |
| 6.00 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | 4.03 | M.T. | 73,400 ₹3.0 L | 73,400 ₹3.0 L |
| 7.00 | ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete | 54.96 | M2 | 415 ₹22,807.57 | 415 ₹22,807.57 |
| 8.00 | Ordinary centering and shuttering or steel shuttering for R.C.C. work including all cost of all cost of all material ,labour and T & P etc. complete | 111.93 | M2 | 686 ₹76,781.92 | 686 ₹76,781.92 |
| 9.00 | Supplying and fixing 75 mm dia G.I. Pipe including cost of all material,labour and T & P etc complete | 3.2 | R.M. | 176 ₹563.20 | 176 ₹563.20 |
| 10.00 | Supplying and fixing marble bench mark plate size 150 X 150 X 25 mm wiyh engraved letters including all cost of labour,material and T & P etc, complete | 1 | NO | 155 ₹155 | 155 ₹155 |
Tender Value
₹16.2 L
EMD Value
₹1.6 L
Closing Date
5 Jan 2022, 10:00 amClosed
EXECUTIVE ENGINEER MGCCD 9 SAMBHAL
MGCCD 9 SAMBHAL
CONSTRUCTION OF HEAD REGULATOR OF CHHACHERA MINOR AT KM. 3.832 OF KAILY DY.
2021_UPIDC_668215_1
04/EE/2021-22
Open Tender
Civil Works - Canal
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.6 L
27 Feb 2026
31 Dec 2021
5 Jan 2022
31 Dec 2021
5 Jan 2022
31 Dec 2021
Amount
Earth work in foundation in dry soil including lift up to 1.5 m & lead up to 30 back filling,watering and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-charge
Laying C.C. M-15 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete
Supplying and filling boulder 20-40 kg. in apron with cost of all material including all cost of labour,material and T & P etc. complete
Laying R.C.C. M-20 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete
Laying R.C.C. M-25 with cement ,coarse sand & 10to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete
Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete
ordinary centering and shuttering or steel shuttering for C.C. work including all cost of labour,material and T. & P. etc. complete
Ordinary centering and shuttering or steel shuttering for R.C.C. work including all cost of all cost of all material ,labour and T & P etc. complete
Supplying and fixing 75 mm dia G.I. Pipe including cost of all material,labour and T & P etc complete
Supplying and fixing marble bench mark plate size 150 X 150 X 25 mm wiyh engraved letters including all cost of labour,material and T & P etc, complete
Supplying and fixing marble name & year plate size 300 X 200 x 25 mm with engraved letters including all cost of labour,material and T & P etc. Complete
Supplying and fixing wheel guard size 150 X 150 X 900 mm including all cost of labour,material and T & P etc. Complete
Providing weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work
Providing G.P. sheet water stop seal filled with bitumen including all cost of labour,material and T & P etc. Complete for construction of settlement joint
Supplying and laying tarfelt in two layers painted with maxphalt including all cost of labour,material and T & P etc. complete
Supplying and filling sealing compound in construction joint including all cost of labour,material and T & P etc. complete
Laying Flat Brick pitching in 1:4 cement mortar over 100 mm thick c.c. 1:3:6 including all cost of material,labour and T & P etc complete
Supplying and filling filter material under C.C. blocks 300 mm thick filter including all cost of all cost of all material, labour and T & P etc. complete
Earthwork in filling for making embankment in ordinary soil including 1.5 m lift and total lead of 1.00 km. by power transport with ramming and dressing the surface to the required level,slope as directed by the engineer-in-charge and also including all cost of borrowed earth from pvt. land,material,labour and T & P etc complete
Dry brick on edge soling Over 150 mm thick stone ballast including all cost of labour,material and T & P etc. complete
Struck deep cement pointing in 1:2 cement mortar including all cost of labour,material and T & P etc. complete
Centering and shuttering in special type of work such as for bridges and flared wing walls including cost of all material,labour and T & P etc. complete
Supplying and filling pea gravel (2 mm to 4 mm size) in the jhirries between the C.C. blocks including cost of all material ,labour and T & P etc. complete
DHARIWAL CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf