| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.0 LAccepted-AOC JUNGLE SIKRI ALIAS KHORABAR THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | ₹34.0 L | 1 | Accepted-AOC Accpted FDR |
| 2 | 2₹34.9 L+₹88,460.42 (2.60%)Rejected-Finance 102 SAI APPARTMENT SIMROL ROAD DREAMLAND MHOW INDORE MADHYA PRADESH 453441 INDIA | INDORE | MADHYA PRADESH | 453441 | ₹34.9 L+₹88,460.42 (2.60%) | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualified in technical evelution |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
18 Aug 2022, 5:00 pmClosed
EE
RDSCRBL
reconstruction of Head regulater cum vrb of unchahar dy km 0.00
2022_UPIDC_721372_1
1277/rdsc/2022-2023
Open Tender
Civil Works - Canal
Item Rate
30 days
raebareli
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹3.6 L
Yes
22 Dec 2022
13 Aug 2022
19 Aug 2022
13 Aug 2022
18 Aug 2022
13 Aug 2022
Amount
Earth Work in making Ramp / approach road / diversion including carriage of earth by means of transport and all labour , T&P required to complete the job with proper manual ramming and compaction to prepare earthen surface for immediate transportation use of road.
Dismnteling of old and damaged existing cement mortar Brick work structure of V.R.B. including all labour T&P etc with proper disposal in initial lead to 50 m. as per direction of engineer-in-charge
Earthwork in excavation in foundation including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils including dewatering with all leads, lifts, labour, T&P and proper disposal etc complete.
Providing and laying A20-M10 mix (1:3:6) plain cement concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) in foundation complete in all respect excluding centering shuttering but including all cost of material, labour and T&P etc to complete the jobas per sanctioned drawing & specification in the direction of Engineer- In - Charge Per cum.
Brick masonry in 1:4 C.M with OPC cement and banda c-sand (F.M 1.5 - 2.0) mortar using M-150 class Bricks complete in all respect including all lead, lifts, all cost of material, labour, curing ,T&P required for proper completion of work as per sanctioned drawing & specification in the direction of Engineer-In -Charge. (Unit Cum.)
Centering & Shuttering of RCC work including rent of shuttering material labour & T&P required for proper completion of work in Sqm.
Providing and Laying A20-M25 mix (1:1:2) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and laying plain cement concrete A20-M20 mix (1:1.5:3) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and laying plain cement concrete A20-M15 mix (1:2:4) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing bending, binding, and placing of reinforcement Fe-500 / Fe-550 TMT deformed bars conforming to IS code to complete all respect including cost of material , labour, binding wire, T&P etc. per M.T
Providing and laying Tar paper between abutment and slab per sqm.
Providing & fixing 75 mm dia PVC pipe 6 kg in wt. in drainage outlet in slab per R.M
Providing and Laying 25 mm thick bituminus fillar board Per Sqm.
Struck cement pointing with cement sand mortar 1:2 complete in all respect including all lead lifts cost of materials labour and T&P etc. per sqm.
10 mm thick brick cement plaster on brick massonary in 1:4 cement sand mortar with floated neat cement including all cost of materials, labour and T&P etc. as per drawing & specification in SQM.
Brick on edge on pitching in 1.4 cement and sand mortar including cost of all material labour & T&P complete
Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift , all labour and T&P with proper dressing to profile per Cum.
Costing and laying of porous blocks of siz230x230x180 mm in 1:4 cement and 20 mm coarse aggregate including all cost of materials labour T & P etc. to complete the work as per drawing and specification in Nos.
Hiring charges of 5 KV Gen set Including operator and P.O.L. for 8 hours running in night time. (Unit per day)
Fabrication oand supply of first stage and second stage imbedment parts, hoiesisting equipment, gates of cross/ Head regulater complete in all respect as per drawing including cost of material labour T&p etc and carriage up to site and cost of painting and commissioning per MT.
Haring of deasel pump 5 HP including suction and dlivery pype, oprator and POL per Hrs..
Boaring with 100mm casing including lowering of casing assembling and extraction casng pype with contractor T&P and equipment up 20 m. per RM.
M/S ROHIT ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .