| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC 00 HAIDARPUR JAMALPUR ROAD SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹27.9 L+₹95,271 (3.53%)Rejected-Finance | L2 | Rejected-Finance Other than L1 Bidder | |
| 3 | L3₹32.1 L+₹5.1 L (18.9%)Rejected-Finance | L3 | Rejected-Finance Other than L1 Bidder |
| Sl No | Description | Qty | Unit | M/S. R.K. ENTERPRISES L1 | M/S. KESHAB CHANDRA GHOSH L2 | PUJA ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repair/repacement/ maintenance for UPS three phase of capacity 120KVA Model No : MGE Galaxy - 5500, Article No - G55 TUPSH 120 HIN of Online double conversion IGBT based PWM technology controlled by Microprocessor/DSP technology 3 phase UPS of capacity 120 KVA with 20min battery backup with Input:- 415 Volts 3 phase AC PF-0.85 Out Put:- Voltage 415V 3 Phase AC Frequency 50Hz +/- 0.1% Hz by Schneider Electric or service agency authorised by Schneider Electric of service Engineer/ delaler of OEM complete all as specified and directed by Engr-in-charge
Note : (a) DC capacitor bank, Output AC capacitor, Input AC capacitor , Cooling Fan, CHAN Board, MIZN Board, ALIN Board, DALIN Board are required for changes within the scope of work in this item after replace the old defective/ unservicable spareparts. This spare parts will be measured and paid separately. Cost of the labour components of fixing of spare parts are inclusive in this item.
(b) Carrying out load test of the UPS using a standard UPS load testing equipment to assess the efficiency of the system.
(c) A Log Book indicating the details of all types of repairs and maintenance carried out at the time of replacement of spare parts has to be recorded by the contractor's rep/supervisor and endorsed by JE(E/M) and AGE(E/M) . The contractor's rep/supervisor will monitor the serviceability of UPS and give report to JE (E/M) and AGE(E/M). This register is required to be produced at the time of claiming payment.
(d) Cost of the spare parts otherthan spare parts mentioned above in note (a) shall be inclusive in this item.
(e) All labour charges and service charge of OEM or their authorised service dealer and tesing report, log book maintenance or others spare parts etc not mentioned in this item shall be inclusive in this item.
(f) Accommodation, Food and Local Transportation for services engineers/ any person working in this work will be arranged by contractor. | 1 | Each Job | 1,49,635 ₹1,49,635 | 1,50,635 ₹1,50,635 | 30,000 ₹30,000 Lowest |
| 2.00 | Repair/repacement/ maintenance for UPS three phase of capacity 120KVA Model No : MGE Galaxy - 5500, Article No - G55 TUPSH 120 HIN of Online double conversion IGBT based PWM technology controlled by Microprocessor/DSP technology 3 phase UPS of capacity 120 KVA with 20min battery backup with Input:- 415 Volts 3 phase AC PF-0.85 Out Put:- Voltage 415V 3 Phase AC Frequency 50Hz +/- 0.1% Hz by Schneider Electric or service agency authorised by Schneider Electric of service Engineer/ delaler of OEM complete all as specified and directed by Engr-in-charge
Note : (a) DC capacitor bank, Output AC capacitor, Input AC capacitor , Cooling Fan, CHAN Board, MIZN Board, ALIN Board, DALIN Board are required for changes within the scope of work in this item after replace the old defective/ unservicable spareparts. This spare parts will be measured and paid separately. Cost of the labour components of fixing of spare parts are inclusive in this item.
(b) Carrying out load test of the UPS using a standard UPS load testing equipment to assess the efficiency of the system.
(c) A Log Book indicating the details of all types of repairs and maintenance carried out at the time of replacement of spare parts has to be recorded by the contractor's rep/supervisor and endorsed by JE(E/M) and AGE(E/M) . The contractor's rep/supervisor will monitor the serviceability of UPS and give report to JE (E/M) and AGE(E/M). This register is required to be produced at the time of claiming payment.
(d) Cost of the spare parts otherthan spare parts mentioned above in note (a) shall be inclusive in this item.
(e) All labour charges and service charge of OEM or their authorised service dealer and tesing report, log book maintenance or others spare parts etc not mentioned in this item shall be inclusive in this item.
(f) Accommodation, Food and Local Transportation for services engineers/ any person working in this work will be arranged by contractor. | 1 | Each Job | 1,49,635 ₹1,49,635 | 1,50,635 ₹1,50,635 | 40,000 ₹40,000 Lowest |
| 3.00 | Supply only DC capacitor bank (Make: Schneider Electirc, Model No 0J-0M-3401097AA or equivalent of L & T/ Siemens). | 2 | Each | 3,44,000 ₹6,88,000 Lowest | 3,44,000 ₹6,88,000 Lowest | 5,11,819 ₹10,23,638 |
| 4.00 | Supply only Output AC capacitor (Make: Schneider Electirc, Model No 0J-0M-341096AB or equivalent of L & T/ Siemens). | 2 | Each | 89,250 ₹1,78,500 Lowest | 89,250 ₹1,78,500 Lowest | 1,32,825 ₹2,65,650 |
| 5.00 | Supply only Input AC capacitor (Make: Schneider Electirc, Model No 3401195SE or equivalent of L & T/ Siemens). | 2 | Each | 67,700 ₹1,35,400 Lowest | 67,700 ₹1,35,400 Lowest | 99,176 ₹1,98,352 |
| 6.00 | Supply only Cooling Fan (Make: Schneider Electirc, Model No 0J-490-0106SE or equivalent of L & T/ Siemens). | 16 | Each | 5,800 ₹92,800 Lowest | 5,800 ₹92,800 Lowest | 7,969 ₹1,27,504 |
| 7.00 | Supply only Cooling Fan (Make: Schneider Electirc, Model No 0J-490-011 or equivalent of L & T/ Siemens). | 5 | Each | 3,500 ₹17,500 | 3,170 ₹15,850 Lowest | 4,604 ₹23,020 |
| 8.00 | Supply only CHAN Board (Make: Schneider Electirc, Model No 0J-0P2614 or equivalent of L & T/ Siemens). | 1 | Each | 27,800 ₹27,800 | 27,771 ₹27,771 Lowest | 37,191 ₹37,191 |
| 9.00 | Supply only MIZN Board (Make: Schneider Electirc, Model No 0J-0P3826KF-Z or equivalent of L & T/ Siemens). | 1 | Each | 67,800 ₹67,800 | 67,700 ₹67,700 Lowest | 99,176 ₹99,176 |
| 10.00 | Supply only ALIN Board (Make: Schneider Electirc, Model No 0J-0P2722FC or equivalent of L & T/ Siemens). | 1 | Each | 39,900 ₹39,900 Lowest | 40,000 ₹40,000 | 56,672 ₹56,672 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 Oct 2025, 6:00 pmClosed
GE AF PANAGARH
GE AF PANAGARH MES AF STATION PANAGARH PO BIRUDIAH WEST BENGAL 713148
REPAIR/ REPLACEMENT/ MAINTENANCE OF VARIOUS CAPACITIES IGBT BASED UPS SYSTEM AND CONNECTED WKS AT AF STN ARJAN SINGH UNDER GE (AF) PANAGARH
2025_MES_732714_1
C/8849/E8
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
AF STATION PANAGARH
Please refer tender documents
7 documents required · 7 mandatory
₹500
GE AF PANAGARH
₹50,000
8 Jan 2026
26 Sept 2025
21 Oct 2025
26 Sept 2025
18 Oct 2025
11 Oct 2025
Amount
Repair/repacement/ maintenance for UPS three phase of capacity 120KVA Model No : MGE Galaxy - 5500, Article No - G55 TUPSH 120 HIN of Online double conversion IGBT based PWM technology controlled by Microprocessor/DSP technology 3 phase UPS of capacity 120 KVA with 20min battery backup with Input:- 415 Volts 3 phase AC PF-0.85 Out Put:- Voltage 415V 3 Phase AC Frequency 50Hz +/- 0.1% Hz by Schneider Electric or service agency authorised by Schneider Electric of service Engineer/ delaler of OEM complete all as specified and directed by Engr-in-charge Note : (a) DC capacitor bank, Output AC capacitor, Input AC capacitor , Cooling Fan, CHAN Board, MIZN Board, ALIN Board, DALIN Board are required for changes within the scope of work in this item after replace the old defective/ unservicable spareparts. This spare parts will be measured and paid separately. Cost of the labour components of fixing of spare parts are inclusive in this item. (b) Carrying out load test of the UPS using a standard UPS load testing equipment to assess the efficiency of the system. (c) A Log Book indicating the details of all types of repairs and maintenance carried out at the time of replacement of spare parts has to be recorded by the contractor's rep/supervisor and endorsed by JE(E/M) and AGE(E/M) . The contractor's rep/supervisor will monitor the serviceability of UPS and give report to JE (E/M) and AGE(E/M). This register is required to be produced at the time of claiming payment. (d) Cost of the spare parts otherthan spare parts mentioned above in note (a) shall be inclusive in this item. (e) All labour charges and service charge of OEM or their authorised service dealer and tesing report, log book maintenance or others spare parts etc not mentioned in this item shall be inclusive in this item. (f) Accommodation, Food and Local Transportation for services engineers/ any person working in this work will be arranged by contractor.
Repair/repacement/ maintenance for UPS three phase of capacity 120KVA Model No : MGE Galaxy - 5500, Article No - G55 TUPSH 120 HIN of Online double conversion IGBT based PWM technology controlled by Microprocessor/DSP technology 3 phase UPS of capacity 120 KVA with 20min battery backup with Input:- 415 Volts 3 phase AC PF-0.85 Out Put:- Voltage 415V 3 Phase AC Frequency 50Hz +/- 0.1% Hz by Schneider Electric or service agency authorised by Schneider Electric of service Engineer/ delaler of OEM complete all as specified and directed by Engr-in-charge Note : (a) DC capacitor bank, Output AC capacitor, Input AC capacitor , Cooling Fan, CHAN Board, MIZN Board, ALIN Board, DALIN Board are required for changes within the scope of work in this item after replace the old defective/ unservicable spareparts. This spare parts will be measured and paid separately. Cost of the labour components of fixing of spare parts are inclusive in this item. (b) Carrying out load test of the UPS using a standard UPS load testing equipment to assess the efficiency of the system. (c) A Log Book indicating the details of all types of repairs and maintenance carried out at the time of replacement of spare parts has to be recorded by the contractor's rep/supervisor and endorsed by JE(E/M) and AGE(E/M) . The contractor's rep/supervisor will monitor the serviceability of UPS and give report to JE (E/M) and AGE(E/M). This register is required to be produced at the time of claiming payment. (d) Cost of the spare parts otherthan spare parts mentioned above in note (a) shall be inclusive in this item. (e) All labour charges and service charge of OEM or their authorised service dealer and tesing report, log book maintenance or others spare parts etc not mentioned in this item shall be inclusive in this item. (f) Accommodation, Food and Local Transportation for services engineers/ any person working in this work will be arranged by contractor.
Supply only DC capacitor bank (Make: Schneider Electirc, Model No 0J-0M-3401097AA or equivalent of L & T/ Siemens).
Supply only Output AC capacitor (Make: Schneider Electirc, Model No 0J-0M-341096AB or equivalent of L & T/ Siemens).
Supply only Input AC capacitor (Make: Schneider Electirc, Model No 3401195SE or equivalent of L & T/ Siemens).
Supply only Cooling Fan (Make: Schneider Electirc, Model No 0J-490-0106SE or equivalent of L & T/ Siemens).
Supply only Cooling Fan (Make: Schneider Electirc, Model No 0J-490-011 or equivalent of L & T/ Siemens).
Supply only CHAN Board (Make: Schneider Electirc, Model No 0J-0P2614 or equivalent of L & T/ Siemens).
Supply only MIZN Board (Make: Schneider Electirc, Model No 0J-0P3826KF-Z or equivalent of L & T/ Siemens).
Supply only ALIN Board (Make: Schneider Electirc, Model No 0J-0P2722FC or equivalent of L & T/ Siemens).
Supply only DALIN Board (Make: Schneider Electirc, Model No 0J-0P2512FA or equivalent of L & T/ Siemens).
S&F for maintenance free lead acid bettery 12 volts 150 AH, 24 plate heavy duty suitable for UPS operation after replacement of old unserviceable battery . (Make : Exide/ Amaron) (Note: (a) warranty for battery required for 24 month from the date of supply (b) Original purchase voucher having GST No and guarantee certificate shall be submit duly defaced/verifed by the Engineer-in-Charge before making payment)
Note:- The contract sum arrived after deduction of amount of Sch of credit as listed in tender Documents.
M/S. KESHAB CHANDRA GHOSH (BID ID -3459076)
PUJA ELECTRICALS (BID ID -3458041)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_820381.xls
BOQ • 1.39 MB
Tender8849.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .