| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-Finance NO 03 PERUMAL KOVIL STREET MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | L1 | Accepted-Finance accepted | |
| 2 | L2₹37.1 L+₹1.5 L (4.35%)Accepted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L2 | Accepted-Finance accepted |
| Sl No | Description | Qty | Unit | A.R.C.ENGINEERING L2 | M.ANBAZHAGAN L1 |
|---|---|---|---|---|---|
| 1.00 | Ash cleaning in ESP HVR transformer floor 32 mtr. (5250 sq.mtr x 8 times) | 42,000 | Sq.mtr | 30.7 ₹15,21,492 | 29.42 ₹14,58,055.2 Lowest |
| 2.00 | Cleaning of one set of HVR transformer, EERM and CERM motors (72 x 8 times) | 576 | Operations | 940 ₹6,38,899.2 | 901 ₹6,12,391.68 Lowest |
| 3.00 | Annual maintenance of HVR transformer. | 72 | Nos | 1,386.33 ₹1,17,782.6 | 1,328.57 ₹1,12,875.31 Lowest |
| 4.00 | Weekly maintenance of HVR transformer. | 3,500 | Operations | 190.08 ₹7,85,030.4 | 182.16 ₹7,52,320.8 Lowest |
| 5.00 | Annual maintenance of LT Breakers in ESP Switchgear, Water treatment plant Switchgear, CWPH Switchgear, RWPH Switchgear and Fire Fighting Switchgear (Removal of L.T Breakers, External Cleaning, cleaning of grease and oil tightness checking of all bolts and nuts applying grease checking of closings tripping mechanism and putting back into original position)
ESP I,II & III Switchgear - 9 Nos
Water treatment plant Switchgear - 5 Nos
CWPH Switchgear - 3 Nos
RWPH Switchgear - 5 Nos
Fire Fighting Switchgear - 9 Nos | 31 | Nos | 2,597.94 ₹95,032.65 | 2,472.44 ₹90,441.86 Lowest |
| 6.00 | Annual Maintenance of F type LT modules in ESP Switchgear, Water treatment plant Switchgear, CWPH Switchgear, RWPH Switchgear and Fire Fighting Switchgear (Removal of Modules, External Cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum jelly to finger contacts, applying grease to the Modules, put back into original position. | 236 | Nos | 128.4 ₹35,756.83 | 123 ₹34,253.04 Lowest |
| 7.00 | Annual Maintenance of K type LT modules in ESP Switchgear, Water treatment plant Switchgear, CWPH Switchgear, RWPH Switchgear and Fire Fighting Switchgear (Removal of Modules, External Cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum jelly to finger contacts, applying grease to the Modules, put back into original position ) | 554 | Nos | 256 ₹1,67,352.32 | 246 ₹1,60,815.12 Lowest |
| 8.00 | Charges for releasing all inspection covers of Bus ducts ,checking of Initial IR value,thorough cleaning by applying Acetone/ IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of Healthiness of Rubber bellows of for ESP 1A,1B,2A,2B,3A,3B LT BUS DUCT, Water treatment plant A & B LT BUS DUCT and CWPH A & B LT BUS DUCT. | 10 | Nos | 12,802 ₹1,51,063.6 | 12,269 ₹1,44,774.2 Lowest |
| 9.00 | Opening of all earth pit for HVR Transformer available in Zero meter Bottom Hopper area, cleaning the earth electrodes & pit, checking the joints and earthing rods if necessary, closing the cover after completion of work (24 Earth pit * 4 times) | 96 | opn | 804.84 ₹91,172.28 | 771.3 ₹87,372.86 Lowest |
| 10.00 | Consumables T&Ps | 1 | LS | 91,626 ₹1,08,118.68 | 87,808 ₹1,03,613.44 Lowest |
Tender Value
Refer Docs
EMD Value
₹29,300
Closing Date
16 Sept 2026, 2:00 pmClosed
SE/ES/NCTPS-I
SE/ES/NCTPS-I,chennai-120
NCTPS I ES Circle EM I Dn SD III Carrying out Routine maintenance activities of HVR Transformer CERM EERM motors Removing the ash deposits and cleaning of ESP HVR Transformer floor area HVR Transformer EERM motors 32mts CERM Motors 7Mtrs of u
2026_EB_700128_1
CE/NCTPS-I/SE/ES/WC-45/2026-27
Open Tender
Power/Energy Projects/Products
Works
360 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹29,300
Yes
28 Sept 2026
1 Sept 2026
17 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ash cleaning in ESP HVR transformer floor 32 mtr. (5250 sq.mtr x 8 times) | 42,000 | Sq.mtr | 25.59 | ₹10,74,780 |
| 2 | Cleaning of one set of HVR transformer, EERM and CERM motors (72 x 8 times) | 576 | Operations | 783.48 | ₹4,51,284.48 |
| 3 | Annual maintenance of HVR transformer. | 72 | Nos | 1,155.28 | ₹83,180.16 |
| 4 | Weekly maintenance of HVR transformer. | 3,500 | Operations | 158.4 | ₹5,54,400 |
| 5 | Annual maintenance of LT Breakers in ESP Switchgear, Water treatment plant Switchgear, CWPH Switchgear, RWPH Switchgear and Fire Fighting Switchgear (Removal of L.T Breakers, External Cleaning, cleaning of grease and oil tightness checking of all bolts and nuts applying grease checking of closings tripping mechanism and putting back into original position)
ESP I,II & III Switchgear - 9 Nos
Water treatment plant Switchgear - 5 Nos
CWPH Switchgear - 3 Nos
RWPH Switchgear - 5 Nos
Fire Fighting Switchgear - 9 Nos | 31 | Nos | 2,149.95 | ₹66,648.45 |
| 6 | Annual Maintenance of F type LT modules in ESP Switchgear, Water treatment plant Switchgear, CWPH Switchgear, RWPH Switchgear and Fire Fighting Switchgear (Removal of Modules, External Cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum jelly to finger contacts, applying grease to the Modules, put back into original position. | 236 | Nos | 107 | ₹25,252 |
| 7 | Annual Maintenance of K type LT modules in ESP Switchgear, Water treatment plant Switchgear, CWPH Switchgear, RWPH Switchgear and Fire Fighting Switchgear (Removal of Modules, External Cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum jelly to finger contacts, applying grease to the Modules, put back into original position ) | 554 | Nos | 214 | ₹1,18,556 |
| 8 | Charges for releasing all inspection covers of Bus ducts ,checking of Initial IR value,thorough cleaning by applying Acetone/ IPA and checking healthiness of supporting insulators & tightness checking of bus bar joints and checking of Healthiness of Rubber bellows of for ESP 1A,1B,2A,2B,3A,3B LT BUS DUCT, Water treatment plant A & B LT BUS DUCT and CWPH A & B LT BUS DUCT. | 10 | Nos | 10,668.9 | ₹1,06,689 |
| 9 | Opening of all earth pit for HVR Transformer available in Zero meter Bottom Hopper area, cleaning the earth electrodes & pit, checking the joints and earthing rods if necessary, closing the cover after completion of work (24 Earth pit * 4 times) | 96 | opn | 670.7 | ₹64,387.2 |
| 10 | Consumables T&Ps | 1 | LS | 76,355 | ₹76,355 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_841567.xls
BOQ • 0.35 MB
corrigendum.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .