Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC | ₹5.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.3 LRejected-Finance 0 JANKI NAGAR NEAR SURAJ HOTEL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | ₹5.3 L | 2 | Rejected-Finance L2 |
| 3 | 3₹5.3 LRejected-Finance | ₹5.3 L | 3 | Rejected-Finance L3 |
| 4 | 4₹5.4 LRejected-Finance | ₹5.4 L | 4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical REJECT |
| Sl No | Description | Qty | Unit | M/S ARVIND KUMAR DUBEY L4 | UPADHYAY CONSTRUCTION L1 | M/s Shree Dauji Enterprises L3 | M/s PARI ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in silt clearance with slush including lead upto 1.5 m and lead upto 30m by manual labour or machine.The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | 850 | Cum | 78.25 ₹66,512.50 | 97.65 ₹83,002.50 | 78.5 ₹66,725 | 78 ₹66,300 |
| 2.00 | Earthwork in silt clearance including lead upto 1.5 m and lead upto 30m by manual labour or machine. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | 7,320 | Cum | 56 ₹4.1 L | 51.15 ₹3.7 L | 56 ₹4.1 L | 55 ₹4.0 L |
| 3.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm | 11,000 | Sqm. | 5.5 ₹60,500 | 4.19 ₹46,090 | 5 ₹55,000 | 5.25 ₹57,750 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
29 Apr 2026, 2:00 pmClosed
Executive Engineer
Irrigation Division, Firozabad
Silt clearance work on the Chuharpur Drain from Km 5.500 to Km 11.200.
2026_UPIDC_1141213_8
01/EE/2026-27
Open Tender
Civil Works
15 days
Silt clearance work on the Chuharpur Drain from Km
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹54,000
8 Jun 2026
24 Apr 2026
29 Apr 2026
24 Apr 2026
29 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork in silt clearance with slush including lead upto 1.5 m and lead upto 30m by manual labour or machine.The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | - | Cum | - | - | 1 |
| 2 | Earthwork in silt clearance including lead upto 1.5 m and lead upto 30m by manual labour or machine. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as per directed by engineer in-charge. | - | Cum | - | - | 12 |
| 3 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm | - | Sqm. | - | - | 14 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.92 MB
documents.pdf
Tender Documents • 28.07 MB
BOQ_2131149.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid