Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All documents submitted |
| 2 | Accepted-Technical | Accepted-Technical All documents submitted |
| 3 | Accepted-Technical | Accepted-Technical All documents submitted |
Tender Value
₹25.1 L
EMD Value
₹2.5 L
Closing Date
30 Apr 2026, 5:00 pmClosed
EO
Npp Banda
Npb School computer lab work
2026_DOLBU_1139189_2
74/NPP/2026-27/Dt 09-04-2026
Open Tender
Civil Works
Percentage
90 days
NPP BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,963
EO
₹2.5 L
15 Jun 2026
20 Apr 2026
2 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Npp School Computer Lab Work | - | - | - | - |
| 2 | Borring of 30 cm dia and 3.50 m depth D.U.R pile on B.C. soil i/c all complete. | - | No | - | - |
| 3 | R.C.C. work with 1:2:4 cement sand & 20 mm stone grit. I/c all material labour t/p etc complete in pile work. | - | m3 | - | - |
| 4 | Earth work excavation in foundation B.C. Soil in Bundel Khand area for foundation of grade beam work cI/c all labour t/p etc complete. | - | m3 | - | - |
| 5 | Sand Filling in foundation of grade beam work I/c all labour, material T&pP etc complete | - | m3 | - | - |
| 6 | C.C.work 1:4:8 with cement,sand & 40 mm stone bailast I/c all material labour t/p etc complete on base wok complete. | - | m3 | - | - |
| 7 | R.C.C. work with 1:1.5:3 cement sand & 20 mm stone grit. I/c all material labour t/p etc complete in grade beam work | - | m3 | - | - |
| 8 | 150 class brick work in boxing work bellow plingth with 1:6 cement sand mortar I/c all material labour t&p etc complete. S.I. 303 | - | m3 | - | - |
| 9 | 2.5 cm thick D.P.C. with 1: 1.5: 3 concreet with aproowed water proof compound I/c all material labour t/p etc complete. | - | m3 | - | - |
| 10 | 150 class brick work with 1:6 cement sand mortar on s/s work I/c all material labour t&p etc complete. | - | m3 | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_2126954.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .