| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC C O MADAN MOHAN BUILDING TOTU SHIMLA 11 TEH DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.2 L+₹32,641.84 (11.3%)Rejected-AOC VILL BASAHARA PO KARTOT TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.9 L+₹99,355.70 (34.5%)Rejected-AOC R O VPO SAMOR TEHSIL DHARAMPUR DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Gopal Singh L2 | Rakesh Saklani L3 | shashikant L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means on all depth and width as required at site including getting out and disposal of excavated earth upto all leads and lifts as directed by Engineer-in-charge. a).All kinds of soil | 386.79 | Cubic Metre | 250 ₹96,697.5 | 290 ₹1,12,169.1 | 200 ₹77,358 Lowest |
| 2.00 | Providing and laying in plain cement concrete of specified grade excluding the cost of centering and shuttering work up to plinth level with 1:5:10 (one cement : five sand : ten graded stone aggregate 40 mm (forty milimetre) nominal size etc. complete in all respect as per satisfaction of Engineer-in-charge. | 1.73 | Cubic Metre | 5,800 ₹10,034 | 5,750 ₹9,947.5 | 5,300 ₹9,169 Lowest |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement work up to plinth level with 1.1.5:3 (one cement : one and half sand : three stone aggregate 20 mm (Twenty milimetre) nominal size) in foundation and plinth etc. Complete in all respect as per satisfaction of Engineer-in-charge. | 4.46 | Cubic Metre | 10,500 ₹46,830 | 11,500 ₹51,290 | 8,700 ₹38,802 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for etc. complete in all respect as per satisfaction of Engineer-in-charge a). Foundations, footings, bases of columns, etc. for mass concrete | 34.08 | Square Metre | 400 ₹13,632 | 420 ₹14,313.6 | 275 ₹9,372 Lowest |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level etc. complete in all respect as per satisfaction of Engineer-in-Charge. a) Thermo-Mechanically Treated bars of grade Fe-500D or more.(Sail ,TISCO, RINL, Jindal Panther of (JSPL),Shyam steel make. | 267.6 | Kilogram | 110 ₹29,436 | 125 ₹33,450 | 97 ₹25,957.2 Lowest |
| 6.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using tube etc. as required. Complete in all respect as per satisfaction of Engineer-in-Charge. a).In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 1,109.82 | Kilogram | 112 ₹1,24,299.84 Lowest | 150 ₹1,66,473 | 115 ₹1,27,629.3 |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
1 Jul 2025, 10:00 amClosed
EE (D)
Office of Estate Organization UHF nauni solan
Providing Katcha approach road from work shop to structure of old gas plant at Dr YSP University of Horticulture and Forestry Nauni- Solan
2025_YSPU_108143_1
UHF/Const-1Partfile/2025/-861
Open Tender
Civil Works
Item Rate
60 days
Nauni Solan
Please refer Tender documents.
4 documents required · 4 mandatory
₹700
EE (D)
₹4,800
23 Sept 2025
20 Jun 2025
1 Jul 2025
20 Jun 2025
1 Jul 2025
20 Jun 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means on all depth and width as required at site including getting out and disposal of excavated earth upto all leads and lifts as directed by Engineer-in-charge. a).All kinds of soil
Providing and laying in plain cement concrete of specified grade excluding the cost of centering and shuttering work up to plinth level with 1:5:10 (one cement : five sand : ten graded stone aggregate 40 mm (forty milimetre) nominal size etc. complete in all respect as per satisfaction of Engineer-in-charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement work up to plinth level with 1.1.5:3 (one cement : one and half sand : three stone aggregate 20 mm (Twenty milimetre) nominal size) in foundation and plinth etc. Complete in all respect as per satisfaction of Engineer-in-charge.
Centering and shuttering including strutting, propping etc. and removal of form for etc. complete in all respect as per satisfaction of Engineer-in-charge a). Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level etc. complete in all respect as per satisfaction of Engineer-in-Charge. a) Thermo-Mechanically Treated bars of grade Fe-500D or more.(Sail ,TISCO, RINL, Jindal Panther of (JSPL),Shyam steel make.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using tube etc. as required. Complete in all respect as per satisfaction of Engineer-in-Charge. a).In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Gopal Singh (BID ID -529255)
Rakesh Saklani (BID ID -529683)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .