| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance VIRAK NAGAR ASSANDH ROAD MOUNT SINAI BAPTIST CHURCH PANIPAT HARYANA 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹3.9 L | L1 | Accepted-Finance ok |
| 2 | L2₹4.2 L+₹23,660 (5.99%)Accepted-Finance HOUSE NO 8 589 BEHIND PHC HOSPITAL OLD BUS STAND KORBA KORBA CHHATTISGARH 495678 | 495678 | ₹4.2 L+₹23,660 (5.99%) | L2 | Accepted-Finance ok |
| 3 | Not Admitted-Fee/PreQual/Technical BALANA ROAD ISRANA PANIPAT 132145 HARYANA | PANIPAT | PANIPAT | HARYANA | 132145 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | BHAGWATI CONSTRUCTION COMPANY L2 | ATULIT CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Cleaning/desiling work | |||||
| 1.01 | ANALYSIS OF RATES FOR CLEANING OF 300 MM ID SEWER PIPE LINE WITH SUPER SUCKER MACHINE
1 Diesel and Oil Cost
a) Super Sucker Machine and Jetting Machine = ?1,27,680
b) Silt Loader = ?1,27,680
c) Water Tanker = ?63,840
d) Diesel for Generator on 20 Hour Basis (@ 6 Ltr. per hour each Gen. Set) = ?3,19,200
Total = ?6,38,400
g) Mobile Oil Cost @ 2% of Diesel Cost = ?12,768
Sub Total `A` = ?6,51,168
2 Cleaning and Plugging of Manholes
b) Cleaning and Plugging of Manholes = ?50,000
c) Cost of Safety Equipments = ?5,600
3 De-Watering and Diversion Cost
a) Pumps (10 HP) = ?50,400
b) Generator 50 KVA = ?50,400
c) Delivery Pipes = ?11,650
Sub Total `B` = ?1,68,050
4 Direct Man Power Cost
a) Foreman = ?9,908
b) Driver = ?19,815
c) Rokawala = ?9,908
d) Skilled Labour = ?59,446
e) Mechanic = ?9,908
f) Electrician = ?9,908
g) Jetting Operator = ?9,908
h) Security Guard = ?19,815
i) Generator Operator/Pump Operator = ?19,815
Sub Total `C` = ?1,68,431
5 Miscellaneous
a) Labour Welfare Expenses = ?20,000
b) Provision for Fresh Air in Manholes = ?5,600
6 Indirect Manpower Cost
a) Cost of Social Security Benefits including Insurance of Workers = ?15,000
b) Office and Logistics Support = ?15,000
c) Cost of Sundries and TandP = ?15,000
7 Provision for Water = ?10,500
8 Direct Over Head
Cost of Machinery, Jetting Hose and Servicing of Machinery = ?57,534
Sub Total `D` = ?1,38,634
Sub Total (A plus B plus C plus D) = ?11,26,283
GST @ 18% = ?2,02,731
Sub Total = ?13,29,014
Contractor Profit @ 10% = ?1,12,628
Grand Total = ?14,41,642
For 1000 Meter Length
Cost Per Meter = ?1,442
Say ?1,442/- Per Mtr.
For 60% Choked Pipe Line
?1,442 × 60% = ?865.20
Say ?865/- Per Mtr. | 246 | Mtr. | 863 ₹2,12,298 | 810 ₹1,99,260 Lowest |
| 1.02 | ANALYSIS OF RATES FOR CLEANING OF 400 MM ID SWD PIPE LINE WITH SUPER SUCKER MACHINE
Diesel and Oil Cost
a) Super Sucker Machine and Jetting Machine = ?6,16,160
b) Silt Loader = ?6,16,160
c) Water Tanker = ?4,92,480
d) Diesel for Generator on 20 Hour Basis (@ 6 Ltr./Hour each Gen. Set) = ?4,10,400
Total Diesel Cost = ?8,20,800
e) Mobile Oil Cost @ 2% of Diesel Cost = ?16,416
Sub Total `A` = ?8,37,216
Cleaning and Plugging of Manholes
a) Cleaning and Plugging of Manholes = ?50,000
b) Cost of Safety Equipments = ?7,200
De-watering and Diversion Cost
a) Pumps (10 HP) = ?64,800
b) Generator 50 KVA = ?64,800
c) Delivery Pipes = ?11,650
Sub Total `B` = ?1,98,450
Direct Manpower Cost
a) Foreman = ?13,846
b) Driver (2 Nos.) = ?31,011
c) Rojedar/Labour = ?13,151
d) Skilled Labour (6 Nos.) = ?62,353
e) Mechanic = ?9,430
f) Electrician = ?10,182
g) Jetting Operator = ?10,385
h) Security Guard (2 Nos.) = ?22,150
i) Generator/Pump Operator (2 Nos.) = ?16,615
Sub Total `C` = ?1,89,123
Miscellaneous
a) Labour Welfare Expenses = ?20,000
b) Provision for Fresh Air in Manholes = ?7,200
Indirect Manpower Cost
a) Social Security Benefits including Insurance of Workers = ?15,000
b) Office and Logistics Support = ?15,000
c) Cost of Sundries and TandP = ?15,000
Provision for Water = ?13,500
Direct Overhead
Cost of Machinery, Jetting Hose and Servicing of Machinery = ?73,973
Sub Total `D` = ?1,59,673
Sub Total (A plus B plus C plus D) = ?13,84,483
Contractor Profit @ 10% = ?1,38,448
Grand Total = ?15,22,931
For 1000 Meter Length
Cost Per Meter = ?1,523
Say ?1,523/- Per Mtr.
For 60% Choked Pipe Line
?1,523 × 60% = ?913.80
Say ?914/- Per Mtr. | 226 | Mtr. | 912 ₹2,06,112 | 865 ₹1,95,490 Lowest |
Tender Value
₹4.2 L
EMD Value
₹8,380
Closing Date
5 Aug 2026, 5:00 pmClosed
VIMAL DEEP
DIV 6 Gurugram
Maintenance of various pocket under Division No.VI,Gurugram. Cleaning/Desilting of internal Sewerage and SWD lines of 300mm and 400mm dia in District Shopping Centre, Sector-47 Gurugram.
2026_HBC_536832_1
2026070487BF B61B 4299 8C1C E353E6810B27257HSV
Open Tender
Civil Works
Works
30 days
Gurugram
2 documents required · 2 mandatory
₹250
₹8,380
Yes
19 Aug 2026
27 Jul 2026
6 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning/desiling work | |||||
| 1.01 | ANALYSIS OF RATES FOR CLEANING OF 300 MM ID SEWER PIPE LINE WITH SUPER SUCKER MACHINE
1 Diesel and Oil Cost
a) Super Sucker Machine and Jetting Machine = ?1,27,680
b) Silt Loader = ?1,27,680
c) Water Tanker = ?63,840
d) Diesel for Generator on 20 Hour Basis (@ 6 Ltr. per hour each Gen. Set) = ?3,19,200
Total = ?6,38,400
g) Mobile Oil Cost @ 2% of Diesel Cost = ?12,768
Sub Total `A` = ?6,51,168
2 Cleaning and Plugging of Manholes
b) Cleaning and Plugging of Manholes = ?50,000
c) Cost of Safety Equipments = ?5,600
3 De-Watering and Diversion Cost
a) Pumps (10 HP) = ?50,400
b) Generator 50 KVA = ?50,400
c) Delivery Pipes = ?11,650
Sub Total `B` = ?1,68,050
4 Direct Man Power Cost
a) Foreman = ?9,908
b) Driver = ?19,815
c) Rokawala = ?9,908
d) Skilled Labour = ?59,446
e) Mechanic = ?9,908
f) Electrician = ?9,908
g) Jetting Operator = ?9,908
h) Security Guard = ?19,815
i) Generator Operator/Pump Operator = ?19,815
Sub Total `C` = ?1,68,431
5 Miscellaneous
a) Labour Welfare Expenses = ?20,000
b) Provision for Fresh Air in Manholes = ?5,600
6 Indirect Manpower Cost
a) Cost of Social Security Benefits including Insurance of Workers = ?15,000
b) Office and Logistics Support = ?15,000
c) Cost of Sundries and TandP = ?15,000
7 Provision for Water = ?10,500
8 Direct Over Head
Cost of Machinery, Jetting Hose and Servicing of Machinery = ?57,534
Sub Total `D` = ?1,38,634
Sub Total (A plus B plus C plus D) = ?11,26,283
GST @ 18% = ?2,02,731
Sub Total = ?13,29,014
Contractor Profit @ 10% = ?1,12,628
Grand Total = ?14,41,642
For 1000 Meter Length
Cost Per Meter = ?1,442
Say ?1,442/- Per Mtr.
For 60% Choked Pipe Line
?1,442 × 60% = ?865.20
Say ?865/- Per Mtr. | - | Mtr. | - | - |
| 1.02 | ANALYSIS OF RATES FOR CLEANING OF 400 MM ID SWD PIPE LINE WITH SUPER SUCKER MACHINE
Diesel and Oil Cost
a) Super Sucker Machine and Jetting Machine = ?6,16,160
b) Silt Loader = ?6,16,160
c) Water Tanker = ?4,92,480
d) Diesel for Generator on 20 Hour Basis (@ 6 Ltr./Hour each Gen. Set) = ?4,10,400
Total Diesel Cost = ?8,20,800
e) Mobile Oil Cost @ 2% of Diesel Cost = ?16,416
Sub Total `A` = ?8,37,216
Cleaning and Plugging of Manholes
a) Cleaning and Plugging of Manholes = ?50,000
b) Cost of Safety Equipments = ?7,200
De-watering and Diversion Cost
a) Pumps (10 HP) = ?64,800
b) Generator 50 KVA = ?64,800
c) Delivery Pipes = ?11,650
Sub Total `B` = ?1,98,450
Direct Manpower Cost
a) Foreman = ?13,846
b) Driver (2 Nos.) = ?31,011
c) Rojedar/Labour = ?13,151
d) Skilled Labour (6 Nos.) = ?62,353
e) Mechanic = ?9,430
f) Electrician = ?10,182
g) Jetting Operator = ?10,385
h) Security Guard (2 Nos.) = ?22,150
i) Generator/Pump Operator (2 Nos.) = ?16,615
Sub Total `C` = ?1,89,123
Miscellaneous
a) Labour Welfare Expenses = ?20,000
b) Provision for Fresh Air in Manholes = ?7,200
Indirect Manpower Cost
a) Social Security Benefits including Insurance of Workers = ?15,000
b) Office and Logistics Support = ?15,000
c) Cost of Sundries and TandP = ?15,000
Provision for Water = ?13,500
Direct Overhead
Cost of Machinery, Jetting Hose and Servicing of Machinery = ?73,973
Sub Total `D` = ?1,59,673
Sub Total (A plus B plus C plus D) = ?13,84,483
Contractor Profit @ 10% = ?1,38,448
Grand Total = ?15,22,931
For 1000 Meter Length
Cost Per Meter = ?1,523
Say ?1,523/- Per Mtr.
For 60% Choked Pipe Line
?1,523 × 60% = ?913.80
Say ?914/- Per Mtr. | - | Mtr. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_615970.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .