| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹7.1 L−₹11,750 (1.63%)Accepted-AOC | H2 | Accepted-AOC approved | |
| 2 | H1₹7.2 LRejected-Finance | H1 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
1 Mar 2024, 3:00 pmClosed
Executive officer
Executive officer Karambakkudi Townpanchayat
Construction of RCC Slab Culvert and Providing CC Pavement at Busstand South Side in Karambakkudi Town Panchayat Pudukottai District.
2024_DTP_431597_1
164/2023
Open Tender
Civil Construction Goods
Works
90 days
Karambakkdui Townpanchayat
II CLASS
3 documents required · 3 mandatory
₹0
₹8,500
Yes
8 Mar 2024
28 Feb 2024
1 Mar 2024
28 Feb 2024
1 Mar 2024
28 Feb 2024
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officers with intial lead and lifts and cleaning and levelling the site etc.,complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10
Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Centering for sides and sofilts for PCC work drinage and sidewall surfaces below 3m height including strutting arrangements as per standard specification and removing the same after the specified period and including cost of all other inciden
Centering for sides and sofilts for RCC work drinage and sidewall surfaces below 3m height including strutting arrangements as per standard specification and removing the same after the specified period and including cost of all other inciden
RCC Cement Concrete 1:1 1/2 : 3 mix (One part cement, one half part of sand and Thiree part of agrrigate) using 20mm size HBG metal from approved quary including cost and convayance of all material to site loading and unloading charges and labour charges mixing. Laying and curing etc. complete. Complying with standard specifications.
Plain Cement Concrete of mix 1 : 2 : 4 (One part of Cement two part of sand four part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying fabrication and placing in position of mild steel or ribbed for steel for all RCC works including cost of steel, binding wire and labour charges for cutting, bending etc. complete as per standard specification.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Plain Cement Concrete 1:1 1/2 : 3 mix (One part cement, one half part of sand and Thiree part of agrrigate) using 20mm size HBG metal from approved quary including cost and convayance of all material to site loading and unloading charges and labour charges mixing. Laying and curing etc. complete. Complying with standard specifications.
T.RAJENDRAN - CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .