Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.1 LRejected-Finance | ₹10.1 L | L2 | Rejected-Finance yeld to bider |
| Sl No | Description | Qty | Unit | Saira Enterprises L1 | Vinayaga Enterprises L2 |
|---|---|---|---|---|---|
| 1.001. PROVIDING CC ROAD TO A.N KUPPAM COLONY AMBEDKAR STREET IN A.N KUPPAM PANCHAYAT GUMMIDIPOONDI UNION | |||||
| 2.00CC ROAD | |||||
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 14.76 | m3 | 131.5 ₹1,940.94 Lowest | 132 ₹1,948.32 |
| 4.00 | Cement Concrete 1:4:8 Mix using 40mm HBG Metal Including cost and conveyance etc complete | 58.88 | M3 | 6,066.5 ₹3,57,195.52 Lowest | 6,070 ₹3,57,401.6 |
| 5.00 | Towards centering charges for all charges etc complete | 155.8 | m2 | 136.5 ₹21,266.7 Lowest | 138 ₹21,500.4 |
| 6.00 | Cement Concrete 1:3:6 Mix using 20mm HBG Metal Including cost and conveyance etc complete | 15.09 | M3 | 6,854.5 ₹1,03,434.41 Lowest | 6,860 ₹1,03,517.4 |
| 7.00 | Cement Concrete 1:2:4 Mix using 20mm HBG Metal Including cost and conveyance etc complete | 46.13 | m3 | 7,468.5 ₹3,44,521.91 Lowest | 7,470 ₹3,44,591.1 |
| 8.00 | Providing and fixing 20mm thick compressible fiber board in expansion joint complete as per drawing and techinical specification | 11.53 | m2 | 224.2 ₹2,585.03 Lowest | 230 ₹2,651.9 |
| 9.00 | Providing and fixing 110mm thick PVC pipe techinical specification | 76.26 | rm | 304.5 ₹23,221.17 Lowest | 310 ₹23,640.6 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,53,749.82 ₹1,53,749.82 Lowest | 1,53,945.24 ₹1,53,945.24 |
Tender Value
₹10.3 L
EMD Value
₹21,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Block Development Officer BP
O/o Block Development Officer BP, Gummidipoondi Un
Providing CC Road in A.N Kuppam colony in Ambedkar nagar in A.N Kuppam Panchayat Gummidipoondi Union
2026_RDTN_657036_1
RC/1167/2025/A2
Open Tender
Civil Works
Works
60 days
Gummidipoondi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,000
Yes
25 Aug 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. PROVIDING CC ROAD TO A.N KUPPAM COLONY AMBEDKAR STREET IN A.N KUPPAM PANCHAYAT GUMMIDIPOONDI UNION | - | - | - | - |
| 2 | CC ROAD | - | - | - | - |
| 3 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 14.76 | m3 | 131.89 | ₹1,946.7 |
| 4 | Cement Concrete 1:4:8 Mix using 40mm HBG Metal Including cost and conveyance etc complete | 58.88 | M3 | 6,066.99 | ₹3,57,224.37 |
| 5 | Towards centering charges for all charges etc complete | 155.8 | m2 | 136.88 | ₹21,325.9 |
| 6 | Cement Concrete 1:3:6 Mix using 20mm HBG Metal Including cost and conveyance etc complete | 15.09 | M3 | 6,854.89 | ₹1,03,440.29 |
| 7 | Cement Concrete 1:2:4 Mix using 20mm HBG Metal Including cost and conveyance etc complete | 46.13 | m3 | 7,468.6 | ₹3,44,526.52 |
| 8 | Providing and fixing 20mm thick compressible fiber board in expansion joint complete as per drawing and techinical specification | 11.53 | m2 | 224.32 | ₹2,586.41 |
| 9 | Providing and fixing 110mm thick PVC pipe techinical specification | 76.26 | rm | 304.9 | ₹23,251.67 |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_787936.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
document.pdf
Tender Documents • 0.56 MB
BOQ_787936.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].