Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | L1 | Accepted-AOC L1 Lowest | |
| 2 | L2₹13.0 L+₹1.7 L (14.7%)Rejected-Finance | L2 | Rejected-Finance Higher Rate | |
| 3 | L3₹14.5 L+₹3.2 L (27.8%)Rejected-Finance | L3 | Rejected-Finance Higher Rate |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
12 May 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MCD MZP
EE MCD MZP Irrigation Coloney Fataha, Mirzapur
Construction of V.R.B. at km. 22.210 of Ghorawal Dy. Under Project for Restoration of Ghorawal Dy. System LOT-4 Retender
2021_UPIDC_573166_14
Tender Notice No-05/E.E/2020-21
Open Tender
Civil Works
Item Rate
45 days
SONEBHADRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹30,000
8 Oct 2021
5 May 2021
12 May 2021
5 May 2021
12 May 2021
5 May 2021
90 days
Amount
E/W Excavation of Foundation in refusal/ garbage soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge.
Laying C.C. (1:3:6) in foundation with cement, course sand and hard stone ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying C.R. stone masonery with (1:3) cement & course sand mortar including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Providing shuttering and centering work for different parts of structure including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying CC (1:1.5:3) for wearing coat work with cement, course sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Carriage, cutting, bending, binding & placing of steel reinforcement and binding wire including all cost of material, labour, T&P, Taxes etc. but excluding cost of binding wire, required for proper completion of work.
Cement sand (1:2) pointing on stone masonery including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
Laying and fixing of joint filler board 18 mm thick including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
E/w for canal section and in back filling of walls with a total lead upto 1.0 km. by truck or tractor trolley including all cost of material, labour, T&P, Taxes etc. required for proper completion of work.
M/S PREM CHAND TRIPATHI
SHREYA CONTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .