Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-Finance | ₹30.4 L | L1 | Accepted-Finance L1 bidder- Hence accepted for AOC. |
| 2 | L2₹44.5 LRejected-Finance GALA NO 1 GURUNANAK CHOWK SOLAPUR | SOLAPUR | SOLAPUR | MAHARASHTRA | ₹44.5 L | L2 | Rejected-Finance L2 bidder- Hence rejected. |
| Sl No | Description | Qty | Unit | Shrikrishna Construction L2 | Shri Panth Krupa Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Ploughing and loosening soil using rotavator at Runway End Safety Area (RESA) inside the operational area .The rate includes the cost of hire and running charges of Tractor rotavator, including driver, fuel, transportation of the Tractor rotavator to and from the site of operation and any other incidental charges all complete as directed by Engineer In Charge. | 2,33,280 | Sqm | 7 ₹16.3 L | 0.5 ₹1.2 L |
| 2.00 | Deploying the manpower as and when required with necessary tools and tackles for assisting the departmental tractor, Manual grass cutting and other works etc as and when required complete as per the directions of Engineer In charge. | 1,590 | Per day | 700 ₹11.1 L | 600 ₹9.5 L |
| 3.00 | Hiring of JCB /3D Hydraulic Excavator for removal of Bushes, Jungle /levelling of heaps etc., as and when required as per the direction of EIC. The rate includes the cost of hire and running charges of JCB, including driver, fuel, transportation of the JCB to and from the site of operation and any other incidental charges all complete as directed by Engineer In Charge | 1,800 | Per Hour | 800 ₹14.4 L | 800 ₹14.4 L |
| 4.00 | Hiring of Truck (of minimum 6 Cum capacity) for disposal of rubbish, malba etc for all leads and lifts and as when required as per the direction of EIC. The rate includes the cost of hire and Running charges of Truck, including driver, fuel, transportation of the Truck to and from the site of operation and any other incidental charges all complete as directed by EIC | 495 | Per Hour | 400 ₹2.0 L | 500 ₹2.5 L |
| 5.00 | Deploying of Heavy duty chain saw/tree cutting machine of minimum displacement of 50.20 cm3 along with skilled machine operator for cutting small trees, tree branches etc. in operational area/ along boundary wall and whereever required inside Airport Premises .The rate includes the cost of hire, fuel, lubricant, skilled operator, trasnportation to and from the site of operation and any other incidental charges all complete as per the direction of Engineer-In-charge. | 95 | Per day | 348 ₹33,060 | 1,500 ₹1.4 L |
| 6.00 | Deploying of Heavy duty Brush Cutter machine of minimum displacement of 40 cm3 along with skilled machine operator for cutting Grass, bushes, shrubs etc in operational area/ along boundary wall and whereever required inside Airport Premises .The rate includes the cost of hire, fuel, lubricant, skilled operator, trasnportation to and from the site of operation and any other incidental charges all complete as per the direction of Engineer-In-charge. | 95 | Per day | 347 ₹32,965 | 1,500 ₹1.4 L |
Tender Value
₹50 L
EMD Value
₹1.5 L
Closing Date
7 Apr 2026, 3:00 pmClosed
SM (E-C)
AAI, Belagavi Airport Sambra Belagavi-591124
Annual Maintenance contract of grass and jungle clearing inside operational area at Belagavi Airport for the year 2026-27
2026_AAI_271203_1
AAI/BGM/ENGG(C)/AMC-Grass Cutting /2026-27
Open Tender
Civil Works
90 days
AAI Belagavi Airport
As per Tender Document
11 documents required · 11 mandatory
₹1,180
₹1.5 L
26 May 2026
17 Mar 2026
9 Apr 2026
17 Mar 2026
7 Apr 2026
17 Mar 2026
17 Mar 2026 - 24 Mar 2026
Ploughing and loosening soil using rotavator at Runway End Safety Area (RESA) inside the operational area .The rate includes the cost of hire and running charges of Tractor rotavator, including driver, fuel, transportation of the Tractor rotavator to and from the site of operation and any other incidental charges all complete as directed by Engineer In Charge.
Deploying the manpower as and when required with necessary tools and tackles for assisting the departmental tractor, Manual grass cutting and other works etc as and when required complete as per the directions of Engineer In charge.
Hiring of JCB /3D Hydraulic Excavator for removal of Bushes, Jungle /levelling of heaps etc., as and when required as per the direction of EIC. The rate includes the cost of hire and running charges of JCB, including driver, fuel, transportation of the JCB to and from the site of operation and any other incidental charges all complete as directed by Engineer In Charge
Hiring of Truck (of minimum 6 Cum capacity) for disposal of rubbish, malba etc for all leads and lifts and as when required as per the direction of EIC. The rate includes the cost of hire and Running charges of Truck, including driver, fuel, transportation of the Truck to and from the site of operation and any other incidental charges all complete as directed by EIC
Deploying of Heavy duty chain saw/tree cutting machine of minimum displacement of 50.20 cm3 along with skilled machine operator for cutting small trees, tree branches etc. in operational area/ along boundary wall and whereever required inside Airport Premises .The rate includes the cost of hire, fuel, lubricant, skilled operator, trasnportation to and from the site of operation and any other incidental charges all complete as per the direction of Engineer-In-charge.
Deploying of Heavy duty Brush Cutter machine of minimum displacement of 40 cm3 along with skilled machine operator for cutting Grass, bushes, shrubs etc in operational area/ along boundary wall and whereever required inside Airport Premises .The rate includes the cost of hire, fuel, lubricant, skilled operator, trasnportation to and from the site of operation and any other incidental charges all complete as per the direction of Engineer-In-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
TenderDocument.pdf
Tender Documents • 5.09 MB
BOQ_317047.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid