| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹37.2 L+₹4.1 L (12.3%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹37.2 L+₹4.1 L (12.4%)Rejected-Finance 0 WARD NO 9 PIPERTAR KATHAN KHAMARIA POLICE CHOWKI SANT RAVIDAS NAGAR UTTAR PRADESH 221306 | BHADOHI | UTTAR PRADESH | 221306 | L3 | Rejected-Finance L3 | |
| 4 | L4₹38.7 L+₹5.6 L (16.9%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹40.6 L+₹7.4 L (22.4%)Rejected-Finance H N 9 12 CHIRANJEEV VIHAR GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Dinesh kumar jindal L4 | SHRI BALAJI CONSTRUCTION L3 | M/S VASUDEV CONSTRUCTION L2 | Modern engg Associates L6 | TIRUPATI ASSOCIATES L1 | AJAY SHARMA L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of thick bushes and thorny jungle with proper disposal without uprooting | 63 | % sqm | 300 ₹18,900 Lowest | 382.4 ₹24,091.2 | 300 ₹18,900 Lowest | 435.6 ₹27,442.8 | 450 ₹28,350 | 440 ₹27,720 |
| 2.00 | Earth work in foundation in all type of soil with all lift and lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-incharge. | 317.27 | cum | 80 ₹25,381.6 | 86.91 ₹27,573.94 | 50 ₹15,863.5 Lowest | 99 ₹31,409.73 | 100 ₹31,727 | 100 ₹31,727 |
| 3.00 | Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 70.55 | cum | 5,300 ₹3,73,915 | 5,214.6 ₹3,67,890.03 Lowest | 5,400 ₹3,80,970 | 5,391.54 ₹3,80,373.15 | 7,000 ₹4,93,850 | 5,500 ₹3,88,025 |
| 4.00 | Centering and shuttering for R.C.C. Work including all cost of material, labour, T&P etc required for proper completion of work. | 896.2 | sqm | 550 ₹4,92,910 | 728.47 ₹6,52,854.81 | 600 ₹5,37,720 | 796.95 ₹7,14,226.59 | 620 ₹5,55,644 | 360 ₹3,22,632 Lowest |
| 5.00 | Laying Reinforcement Cement Concrete A25 M-20 (1 cement :1.5 coarse sand :3 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 85.71 | cum | 6,800 ₹5,82,828 | 5,271.22 ₹4,51,796.27 Lowest | 7,000 ₹5,99,970 | 7,109.19 ₹6,09,328.67 | 7,000 ₹5,99,970 | 7,218 ₹6,18,654.78 |
| 6.00 | Providing & Fixing Steel Reinforcement (TMT Fe-550) with cost of bending, binding, cutting and placing of reinforcement i/c all cost of binding wire, material, labour, T&P etc required for proper completion of work. | 9.02 | MT | 74,500 ₹6,71,990 | 64,800.96 ₹5,84,504.66 | 55,000 ₹4,96,100 | 73,815.39 ₹6,65,814.82 | 6,500 ₹58,630 Lowest | 74,576 ₹6,72,675.52 |
| 7.00 | Brick work in 1:4 CM for laid flat bricks over 12 mm thick cement mortar i/c all cost of material, labour, T&P etc required for proper completion of work. | 233.67 | cum | 4,850 ₹11,33,299.5 | 4,410.41 ₹10,30,580.5 | 5,200 ₹12,15,084 | 5,490.54 ₹12,82,974.48 | 4,050 ₹9,46,363.5 Lowest | 5,548 ₹12,96,401.16 |
| 8.00 | 12 mm thick plaster with cement and sand in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 1,807.57 | sqm | 175 ₹3,16,324.75 | 155.82 ₹2,81,655.56 | 100 ₹1,80,757 Lowest | 177.21 ₹3,20,319.48 | 150 ₹2,71,135.5 | 192 ₹3,47,053.44 |
| 9.00 | Providing & Fixing Steel work in built up tubler( round, square or rectangular hollow tubes etc.) trusses etc. including all cost of material, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welding and bolting with special shaped washers etc. Complete of work. | 881.94 | KG | 110 ₹97,013.4 | 162.86 ₹1,43,632.75 | 100 ₹88,194 Lowest | 188.1 ₹1,65,892.91 | 160 ₹1,41,110.4 | 190 ₹1,67,568.6 |
| 10.00 | Finishing wall with wether coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, T&P etc. complete. | 1,807.57 | sqm | 85 ₹1,53,643.45 Lowest | 85.17 ₹1,53,950.74 | 100 ₹1,80,757 | 97.02 ₹1,75,370.44 | 100 ₹1,80,757 | 98 ₹1,77,141.86 |
Tender Value
₹47.6 L
EMD Value
₹96,000
Closing Date
13 Oct 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1st IWC Meerut
SE Office 1st IWC Meerut
As per the NIT
2025_UPIDC_1079800_9
10/SE-1/2025-26
Open Tender
Civil Works
Piece-work
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹96,000
SE Office 1st IWC Meerut
1 Nov 2025
8 Oct 2025
13 Oct 2025
8 Oct 2025
13 Oct 2025
8 Oct 2025
10 Oct 2025
Amount
Cleaning of thick bushes and thorny jungle with proper disposal without uprooting
Earth work in foundation in all type of soil with all lift and lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-incharge.
Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work.
Centering and shuttering for R.C.C. Work including all cost of material, labour, T&P etc required for proper completion of work.
Laying Reinforcement Cement Concrete A25 M-20 (1 cement :1.5 coarse sand :3 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work.
Providing & Fixing Steel Reinforcement (TMT Fe-550) with cost of bending, binding, cutting and placing of reinforcement i/c all cost of binding wire, material, labour, T&P etc required for proper completion of work.
Brick work in 1:4 CM for laid flat bricks over 12 mm thick cement mortar i/c all cost of material, labour, T&P etc required for proper completion of work.
12 mm thick plaster with cement and sand in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
Providing & Fixing Steel work in built up tubler( round, square or rectangular hollow tubes etc.) trusses etc. including all cost of material, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welding and bolting with special shaped washers etc. Complete of work.
Finishing wall with wether coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, T&P etc. complete.
Providing and applying two coat of approved enamel paint including cost of material, labour, T&P etc. required for proper completion of work.
M/S VASUDEV CONSTRUCTION (BID ID -5600854)
SHRI BALAJI CONSTRUCTION (BID ID -5600536)
Dinesh kumar jindal (BID ID -5592473)
AJAY SHARMA (BID ID -5596267)
Modern engg Associates (BID ID -5601461)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .