| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹27.1 L (18.7%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹1.7 Cr+₹27.1 L (18.7%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical OLD NO 36 NEW NO 16 7TH EAST MAIN ROAD GANDHI NAGAR VELLORE 632 006 | VELLORE | VELLORE | TAMIL NADU | 632006 | - | - | Rejected-Technical BQR not satisfied |
| 4 | Rejected-Technical NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | - | - | Rejected-Technical BQR not satisfied |
| 5 | Rejected-Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | - | - | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L1 | ULTRAPOWER BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Levelling the site | 1,320 | M3 | - | - |
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Hard Gravelly soil SS 20B | 1,707 | M3 | - | - |
| 3.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. SDR NOT REQUIRING BLASTING | 341.5 | M3 | - | - |
| 4.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. MR & DMR NOT Requiring BLASTING | 341.5 | M3 | - | - |
| 5.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Hard rock Requiring BLASTING | 853.5 | M3 | - | - |
| 6.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Hard rock Requiring wedging and chisselling | 171 | M3 | - | - |
| 7.00 | Plain cement concrete 1:3:6 using 20mm HBG machine crushed metal for foundation without formwork including cost of all materials, labour, lead, lift, etc., complete. | 132 | M3 | - | - |
| 8.00 | RCC M 20 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. Footing | 589 | M3 | - | - |
| 9.00 | RCC M 20 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. Column | 185 | M3 | - | - |
| 10.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site. | 62 | MT | - | - |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
28 Nov 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Providing foundation concrete, supply and erection of AH towers, WC, VC with BH, WB, C F Booms at the proposed 230 110 KV SS at Sathumadurai.
2019_EB_147316_1
TP1-064/2019-20
Open Tender
Civil Works
Works
120 days
Sathumathurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
Yes
2 Jan 2020
16 Nov 2019
29 Nov 2019
16 Nov 2019
28 Nov 2019
16 Nov 2019
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Levelling the site
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Hard Gravelly soil SS 20B
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. SDR NOT REQUIRING BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. MR & DMR NOT Requiring BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Hard rock Requiring BLASTING
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. Hard rock Requiring wedging and chisselling
Plain cement concrete 1:3:6 using 20mm HBG machine crushed metal for foundation without formwork including cost of all materials, labour, lead, lift, etc., complete.
RCC M 20 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. Footing
RCC M 20 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. Column
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site.
Supply and fabrication charges of template set to site WC and VC columns foundation bolts fixing etc including cost of all labour lead and lift etc complete .
Labour charges for setting of template set for WC and VC columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete VC Column
Labour charges for setting of template set for WC and VC columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete WC Column
Labour charges for setting of template set for WC and VC columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete AH Tower
Fabrication and supply of foundation bolts of 20 mm dia with average depth of 2.00m including providing L angle at bottom and threading at top and galvanizing the top of bolt including cost of 20mm dia rod, 3 nos nuts all materials, labour lead lift etc c
Erection of various tower parts vertical columns , booms etc as per drawing including sorting out at site , erection, tightening , punching , final checking, providing holes wherever necessary and final checking etc., complete including cost of all labour lead lift etc complete.
Refilling with excavated earth other than sand complying to standard specifications including watering consolidation , etc., as directed.
Removal of excess earth to a distance of 300 M by head load with all lead and lift etc., complete.
Plastering in cm 1:3, 12 mm thick for transformer plinth including cost of cement, all materials, labour, lead, lift etc., complete.
colour washing one coats using colouring pigments with white cement over white washing one coat using good quality white cement ncluding cost of all materials , labour, lead lift etc., complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
ULTRAPOWER BUILDERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_177324.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .