Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.5 LAccepted-Finance | ₹9.5 L | 1 | Accepted-Finance L-1 |
| 2 | 2₹9.9 LAccepted-Finance | ₹9.9 L | 2 | Accepted-Finance L-2 |
| 3 | 3₹10.8 LAccepted-Finance 0 A K ENTERPRISES SADAR ROAD BALOD GANGA MAIYA BOOK DIPO NEAR BALOD CHHATTISGARH 491226 UDYAM CG 17 0002983 | BALOD | CHHATTISGARH | 491226 | ₹10.8 L | 3 | Accepted-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S YASHVARDHAN ENGINEERING WORKS L1 | A K ENTERPRISES L3 | M/S Shiv Shakti Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00Clearance of dense jungle and cutting of grasses, kush and kanse including uprooting of rank of vegetation grass, bushes and scarping the grass, bush wood etc. above 2 inchh over the ground level. Weeding out the wild growth roots, seeds etc. and collecting foreign materials, kankar, ballast pebbles, waste paper etc in switchyard area around the 400 KV GIS control room, 400 KV GIS Hall, 220 KV GIS Hall & 132 KV GIS Hall, sub-station and open store area at the sub-station then digging and taking out the complete root then dispose of all the removed vegetation, rubbish and garbage etc. by throwing it outside the periphery of the sub-station premises with all cost of men, misc, consumables and T&P etc. required for the job as per details below- | ||||||
| 1.10 | Ist cutting of grass between 01.11.2025 To 30.11.2025 | 47,600 | Sq.Mtr. | 2.12 ₹1.0 L | 2.5 ₹1.2 L | 2.2 ₹1.0 L |
| 1.20 | IInd cutting of grass between 01.02.2026 To 28.02.2026 | 47,600 | Sq.Mtr. | 2.12 ₹1.0 L | 2.5 ₹1.2 L | 2.2 ₹1.0 L |
| 1.30 | IIIrd cutting of grass between 01.05.2026 To 31.05.2026 | 47,600 | Sq.Mtr. | 2.12 ₹1.0 L | 2.5 ₹1.2 L | 2.2 ₹1.0 L |
| 1.40 | IVth cutting of grass between 01.08.2026 To 31.08.2026 | 47,600 | Sq.Mtr. | 2.12 ₹1.0 L | 2.5 ₹1.2 L | 2.2 ₹1.0 L |
| 2.00 | One-time spraying of Roundup / Glyphosate herbicide liquid mixed with Ammonium Sulphate crystals, diluted with water in the ratio of 1:60, using a manually operated spraying machine, on grass/wild growth/plants in the switchyard area around the 400 KV GIS control room, 400 KV GIS hall, 220 KV GIS hall, 132 KV GIS hall, open store area, etc., at the sub-station. | 47,600 | Sq.Mtr. | 1.96 ₹93,296 | 2.2 ₹1.0 L | 2 ₹95,200 |
| 3.00Uprooting of small wild trees in switchyard area between pale fencing area between chain link fencing and security wall, area around 400 KV GIS control room, 400 KV GIS Hall, 220 KV GIS Hall & 132 KV GIS Hall open store area at the sub-station then digging and taking out the complete root then dispose of all the removed vegetation, rubbish and garbage etc. by throwing it outside the periphery of the sub-station premises and finally leveling the ground with all cost of men, misc consumables and T&P etc required for the job as per details below- | ||||||
| 3.10 | Ist cutting of small wild trees between 01.11.2025 To 30.11.2025 | 550 | Nos. | 17.7 ₹9,735 | 18.5 ₹10,175 | 18 ₹9,900 |
| 3.20 | IInd cutting of small wild trees between 01.02.2026 To 28.02.2026 | 500 | Nos. | 17.7 ₹8,850 | 18.5 ₹9,250 | 18 ₹9,000 |
| 3.30 | IIIrd cutting of small wild trees between 01.05.2026 To 31.05.2026 | 480 | Nos, | 17.7 ₹8,496 | 18.5 ₹8,880 | 18 ₹8,640 |
Tender Value
₹9.6 L
EMD Value
₹9,600
Closing Date
6 Apr 2026, 5:00 pmClosed
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2026_UPTCL_1131858_1
Very Short Term E-Tender No. ETC-II/L/57/2025-26
Open Tender
Electrical Works
365 days
ETD, RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC-II, UPPTCL, LUCKNOW
₹9,600
18 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
6 Apr 2026
31 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Clearance of dense jungle and cutting of grasses, kush and kanse including uprooting of rank of vegetation grass, bushes and scarping the grass, bush wood etc. above 2 inchh over the ground level. Weeding out the wild growth roots, seeds etc. and collecting foreign materials, kankar, ballast pebbles, waste paper etc in switchyard area around the 400 KV GIS control room, 400 KV GIS Hall, 220 KV GIS Hall & 132 KV GIS Hall, sub-station and open store area at the sub-station then digging and taking out the complete root then dispose of all the removed vegetation, rubbish and garbage etc. by throwing it outside the periphery of the sub-station premises with all cost of men, misc, consumables and T&P etc. required for the job as per details below- | - | - | - | - | |
Ist cutting of grass between 01.11.2025 To 30.11.2025 | 47,600 | Sq.Mtr. | - | - | |
IInd cutting of grass between 01.02.2026 To 28.02.2026 | 47,600 | Sq.Mtr. | - | - | |
IIIrd cutting of grass between 01.05.2026 To 31.05.2026 | 47,600 | Sq.Mtr. | - | - | |
IVth cutting of grass between 01.08.2026 To 31.08.2026 | 47,600 | Sq.Mtr. | - | - | |
One-time spraying of Roundup / Glyphosate herbicide liquid mixed with Ammonium Sulphate crystals, diluted with water in the ratio of 1:60, using a manually operated spraying machine, on grass/wild growth/plants in the switchyard area around the 400 KV GIS control room, 400 KV GIS hall, 220 KV GIS hall, 132 KV GIS hall, open store area, etc., at the sub-station. | 47,600 | Sq.Mtr. | - | - | |
Uprooting of small wild trees in switchyard area between pale fencing area between chain link fencing and security wall, area around 400 KV GIS control room, 400 KV GIS Hall, 220 KV GIS Hall & 132 KV GIS Hall open store area at the sub-station then digging and taking out the complete root then dispose of all the removed vegetation, rubbish and garbage etc. by throwing it outside the periphery of the sub-station premises and finally leveling the ground with all cost of men, misc consumables and T&P etc required for the job as per details below- | - | - | - | - | |
Ist cutting of small wild trees between 01.11.2025 To 30.11.2025 | 550 | Nos. | - | - | |
IInd cutting of small wild trees between 01.02.2026 To 28.02.2026 | 500 | Nos. | - | - | |
IIIrd cutting of small wild trees between 01.05.2026 To 31.05.2026 | 480 | Nos, | - | - |
stage.html
html • 0.04 MB
techsummary_2112225.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
TD57.pdf
Tender Documents • 2.05 MB
BOQ_2112225.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid