| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical AT KOLHASINGHA P O SIHA P S BADACHANA DIST JAJPUR 755044 | JAJPUR | JAJPUR | ODISHA | 755044 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹5.5 Cr
EMD Value
₹5.5 L
Closing Date
13 Aug 2026, 5:00 pmClosed
Chief Construction Engineer
O/o ChiefConstructionEngineer,CentralRWCircle,BBSR
Construction of Udayagiri to Ugratara Temple via Patrapada road in the District of Khurda under MMSY-Transferred Road Improvement Programme (MMSY-TRIP) for the year 2025-26
2026_CERWI_138117_1
Tender Online CC 14 of 2026
National Competitive Bid
Civil Works - Roads
Percentage
270 days
Bhubaneswar
4 documents required · 4 mandatory
₹10,000
₹5.5 L
Yes
14 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 45 | Cum | 877.16 | ₹39,472.2 |
| 2 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete. | 22,000 | Sqm | 8.63 | ₹1,89,860 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision).
With mechanical lead upto 1000m | 33,731.28 | Cum | 271.82 | ₹91,68,836.53 |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 691.39 | Cum | 50.46 | ₹34,887.54 |
| 5 | Excavation in ordinary rock using Hydraulic Excavator of 0.9 cum bucket capacity including cutting and loading in tippers,transporting to embankment site with a lift upto 1000m,trimming bottom and side slopes in accordance with requirements of lines,grades and cross-section as per Techinal Specification clause 302.3.5. | 50.89 | Cum | 74.79 | ₹3,806.06 |
| 6 | Fine dressing and turfing including transportation by mechanical means with all lead and lift and placing of turf in position and ramming with thapies and including watering and cost of all labour, materials etc. complete as per Clause 309 of MORD Specification and as per direction of the Engineer in Charge. | 5,640 | Sqm | 28.47 | ₹1,60,570.8 |
| 7 | Providing and constructing well compacted drainage layer above the subgrade of roadwork with approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002. | 315.47 | Cum | 1,440.13 | ₹4,54,317.81 |
| 8 | Providing aggregate plugat on sides of drainage layer in road work using Gr-III agrregate of required size as per drawing & technical specification clause 5.8 of SP-20 and clause 401.5 of MORD | 4,577.16 | Cum | 1,803.87 | ₹82,56,601.61 |
| 9 | Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision) | 2,841.5 | Cum | 2,520.95 | ₹71,63,279.43 |
| 10 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MORD Technical Specification Clause 502 for low porosity surface and as per direction of Engineer-in-Charge. | 17,977.5 | Sqm | 36.92 | ₹6,63,729.3 |
stage.html
html • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.37 MB
Tendernotice_1.pdf
PDF • 2.95 MB
BOQ_604989.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .