Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
8 Mar 2024, 3:00 pmClosed
BDO,Aranthangi
Pt.Union Office,Aranthangi
Construction of Kalaiarangam at Near Sri Nalla Kootha Perumal Ayyanar and Adailkalam Kathar Kovil in Kurumbur Panchayat
2024_RDTN_444815_1
KURUMBUR KALAIARANGAM
Open Tender
Civil Works
Item Rate
180 days
Aranthangi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
8 Mar 2024
8 Mar 2024
8 Mar 2024
8 Mar 2024
8 Mar 2024
8 Mar 2024
Amount
Construction of Kalaiarangam at Near Sri Nalla Kootha Perumal Ayyanar and Adailkalam Kathar Kovil in Kurumbur Panchayat
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
Filling with M.sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges etc complete.
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance to work site including all labour charges etc complete
Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of all materials of all materials to site and labour charges etc. complete
Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc.,complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Special ceiling plastering with cement mortor 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete.
Weathering Course Concrete to 80 mm thickness (average) using 20mm size Brick jelly with slacked lime in the proportion 32:12:50 (No sand to be used) including cost and conveyance of all materials to work site and all labour charges etc., complete.
Finishing with one layer of Pressed Tiles of size 20 cm x 20cm x 20mm embedded in Cement Mortor 1:3 mix mixed with Water Proofing compound and pointed with same mixed mortor to full depth of tiles etc., complete.
Cost and supply of steel door of size 0.90 x 2.10 m including cost and conveyance of materials to work site and all labour charges etc.complete.
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth including cost and conveyance of materials to work site and all labour charges etc.complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc.complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S. VALARMATHI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .