| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹1.9 L Quoted ₹19.4 L | L1 | Accepted-AOC TCR |
| 2 | Rejected-Technical S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | HAREKRISHNA ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00Discription of items | ||||
| 2.00 | 315kVA, 3.3kV/SSOV FLP TSU No.1 Collection of trolleys and lifting to surface from RVILA seam near bonbahal pump to workshop for loading of TSU and its breaker | 1 | ls | 14,848.39 ₹14,848.39 |
| 3.00 | Dismantling of primary breaker from TSU and loading the same on two sets of trolleys lifted from Dismantling of Primary breaker from TSU and loading underground and transporting the same to pit top for lowering | 1 | ls | 18,138.63 ₹18,138.63 |
| 4.00 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering | 1 | ls | 31,425.39 ₹31,425.39 |
| 5.00 | Transportation of transwitch unit and its breaker () from pit bottom of pit no 3 to 41/4WD (in RVII seam) over track line manually. Then from 4L/4WD (in RVII seam) to 91/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 16L/5WD over track line & haulage (v) transportation from 16L/SWD to 18L/9WD manually on floor. | 1 | ls | 1,48,483.94 ₹1,48,483.94 |
| 6.00 | Assembling of TSU's primary breaker and placing it in 5 position | 1 | ls | 11,558.16 ₹11,558.16 |
| 7.00 | 315kVA, 3.3kV/550V FLP TSU No.2 Collection of trolleys and lifting to surface from RVIIA seam near bonbahal pump to workshop for loading of TSU and its breaker | 1 | ls | 14,848.39 ₹14,848.39 |
| 8.00 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering | 1 | ls | 18,138.63 ₹18,138.63 |
| 9.00 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering | 1 | ls | 31,425.39 ₹31,425.39 |
| 10.00 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually. Then from 41/4WD (in RVII seam) to 9L/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 161/5WD over track line & haulage (v) transportation from 16L/5WD to 18L/9WD manually on floor | 1 | ls | 1,33,296.75 ₹1,33,296.75 |
Tender Value
₹19.4 L
EMD Value
₹24,300
Closing Date
21 Nov 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 3.3kV/550V UG Electrical substation with substation foundation for LHCM package in RVIIA seam at Shyamsundarpur colliery under Bankola area.
2025_ECL_346916_1
ECL/GM/BA/E TENDER/25-26/ENM/196 Dt 6.11.2025
Open Tender
Electrical and Maintenance Works
30 days
Shyamsundarpur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹24,300
22 Jan 2026
6 Nov 2025
22 Nov 2025
6 Nov 2025
21 Nov 2025
6 Nov 2025
6 Nov 2025 - 11 Nov 2025
Amount
Discription of items
315kVA, 3.3kV/SSOV FLP TSU No.1 Collection of trolleys and lifting to surface from RVILA seam near bonbahal pump to workshop for loading of TSU and its breaker
Dismantling of primary breaker from TSU and loading the same on two sets of trolleys lifted from Dismantling of Primary breaker from TSU and loading underground and transporting the same to pit top for lowering
Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering
Transportation of transwitch unit and its breaker () from pit bottom of pit no 3 to 41/4WD (in RVII seam) over track line manually. Then from 4L/4WD (in RVII seam) to 91/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 16L/5WD over track line & haulage (v) transportation from 16L/SWD to 18L/9WD manually on floor.
Assembling of TSU's primary breaker and placing it in 5 position
315kVA, 3.3kV/550V FLP TSU No.2 Collection of trolleys and lifting to surface from RVIIA seam near bonbahal pump to workshop for loading of TSU and its breaker
Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering
Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering
Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually. Then from 41/4WD (in RVII seam) to 9L/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 161/5WD over track line & haulage (v) transportation from 16L/5WD to 18L/9WD manually on floor
Assembling of TSU's primary breaker and placing it in 10 position
HT and LT FLP circuit breakers Transportation of 5(Five) no. of 3.3kV FLP breaker from workshop.i) Collection of trolley from RVIIA seam after unloading of TSU.11 ii) Loading and transportation to pit top and lowering the same through pit no.3.iii) Transportation from pit bottom (RVII seam to 16L/5WD (RVIIA seam) over haulage lines to 18L/9WD manually on floor.
Transportation of 6(Six) no. of 550V FLP breaker and 1(One) Nos. of lighting unit from workshop.i) Collection of trolley from RVIIA seam after unloading of TSU.ii) Loading and transportation to pit top and lowering the same through pit no.3.iii) Transportation from pit bottom (RVII seam to 16L/5WD (RVIIA seam) over haulage lines to 18L/9WD manually on floor.
Power circuit from surface CHP substation to UG substation Unreeling from reel at surface, Transportation, laying and hanging on pillar hooks of 150sqmm/120 sqmm 13 3.3KV, 900 mtr PVC armoured cable, transporting from surface and laying the same from CHP substation to Incline mouth to 700m in Incline (appx.900mtr
Unreeling from reel at surface, Transportation of 150sqmm/120 sqmm 3.3KV, 700 mtr PVC armoured cable from surface to Incline mouth to 700m in Incline 14 and further transporting, laying and hanging on pillar hooks from said location via drift top of RVII seam to drift bottom of RVIIA seam and than from 18L/9WD (appx.700mtr total)
CIVIL WORK Recess cutting in hard stone for Electrical sub-station->
Fly ash Brick work(1:6) for Electrical sub-station->
RC(1:2:4) for Electrical sub-station->
Cement Plaster for Electrical sub-station->
Materiais Loading and Unloading for Electrical sub-station
Avg lead of materials upto 250 ft for electrical sub-station
Debris Cleaning for Electrical sub-station->
Lifting of Empty Tub for Electrical foundation
White Washing for Electrical foundation
Roof bolting in Stone for Electrical foundation
Wire getting with carrying and fitting for Electrical toundation
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_359610.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid