Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC - |
| 2 | L2₹7.5 LRejected-Finance | ₹7.5 L | L2 | Rejected-Finance Highest amount qouted |
| Sl No | Description | Qty | Unit | B.Vinothkumar L2 | G.Purusothaman L1 |
|---|---|---|---|---|---|
| 1.00Renewal of the road to Kammapalayam to Musilnaidukuppam KM 0/0-0/400 (R-445) in Jambukulam Panchayat Sholinghur Union in Ranipet District | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 288 | cum | 6.3 ₹1,814 | 6.3 ₹1,814 |
| 3.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A | 108 | cum | 140.5 ₹15,174 | 140 ₹15,120 |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 1.83 | cum | 3,987.5 ₹7,297 | 3,987 ₹7,296 |
| 5.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 1.03 | cum | 4,670.5 ₹4,811 | 4,670 ₹4,810 |
| 6.00 | Applying Tack coat over WMM surface using 3.0 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5 | 1,500 | cum | 20.21 ₹30,315 | 20.21 ₹30,315 |
| 7.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., | 45 | Sqm | 11,210 ₹5.0 L | 11,210 ₹5.0 L |
| 8.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface | 80 | Sqm | 890 ₹71,200 | 890 ₹71,200 |
| 9.00 | Provision for Hectometer stone | 2 | Sqm | 574.5 ₹1,149 | 574 ₹1,148 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. | 1 | GST Amount | 1,14,517.8 ₹1.1 L | 1,14,507.54 ₹1.1 L |
Updated dates
Tender Value
₹7.5 L
EMD Value
₹7,680
Closing Date
13 Feb 2026, 3:05 pmClosed
BDO
BDO
Renewal of the Road from Musalnaidukuppam Road km 0 to 400m
2026_RDTN_653423_1
A2/3657/2025
Open Tender
Civil Works
BDO Office sholinghur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,680
Yes
12 Mar 2026
9 Feb 2026
13 Feb 2026
9 Feb 2026
13 Feb 2026
9 Feb 2026
Renewal of the road to Kammapalayam to Musilnaidukuppam KM 0/0-0/400 (R-445) in Jambukulam Panchayat Sholinghur Union in Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Applying Tack coat over WMM surface using 3.0 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc.,
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminou s Surface
Provision for Hectometer stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_783551.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid