Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.1 LAccepted-Finance HNO 480 DIGIANA GANGYAL JAMMU | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹86.5 L+₹5.4 L (6.62%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹92.9 L+₹11.8 L (14.6%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹98.1 L+₹17.0 L (20.9%)Rejected-Finance | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹1.2 Cr+₹35.1 L (43.2%)Rejected-Finance | L5 | Rejected-Finance Being L5 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
14 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer University Works Department
Construction of Centre for Regional Studies adjoining Dhanvantri Library including providing and fixing of UPVC three track sliding window with mesh for Centre for Regional Studie and Gandhian Centre for Peace and Conflict Studies at New Campus
2026_UDJK_330253_1
Fresh enit 253 dated 2-11-26
Open Tender
Civil Works
Percentage
300 days
University of Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Executive Engineer University Works Department
₹2.6 L
19 Nov 2026
4 Nov 2026
16 Nov 2026
4 Nov 2026
14 Nov 2026
4 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar. | 21.94 | Cum | 1,458.45 | ₹31,998.39 |
| 2 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : From brick work in cement mortar. | 2.96 | Nos | 4,944.1 | ₹14,634.54 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix). | 9.3 | Cum | 1,725.2 | ₹16,044.36 |
| 4 | Engage Labour for pruing of mango tree including disposal of all rubbish with all leads and lifts. Mazdoor | 5 | No | 553 | ₹2,765 |
| 5 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 239.66 | Cum | 592.9 | ₹1,42,094.41 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 32.18 | Cum | 4,826.5 | ₹1,55,316.77 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 136.93 | Cum | 5,733.6 | ₹7,85,101.85 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 50.47 | Cum | 7,788.4 | ₹3,93,080.55 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). In Super Structure | 106.72 | Cum | 9,821.85 | ₹10,48,187.83 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level and in super structure. | 22,201 | Kgs | 123.2 | ₹27,35,163.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1120419.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .