Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance JHARKHAND | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.4 L
EMD Value
₹47,000
Closing Date
20 Jun 2026, 5:00 pmClosed
EE RDSD LATEHAR
EE RDSD LATEHAR
CONSTRUCTION OF CHHALKA BRIDGE OVER BAHERNALA OF VILL- PURANI DUNDU , PANCHAYAT- DUNDU, BLOCK MANIKA , DIST - LATEHAR
2026_RDSPL_115152_1
EE/RDSD/LATEHAR/09/2026-27
Open Tender
Civil Works
Percentage
120 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹47,000
Yes
10 Aug 2026
13 Jun 2026
22 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in Excavation in Foundation Trenches in all kinds of soil do-do all complete as per building specification and direction of E/I. | - | M3 | 203.58 | - |
| 2 | Providing and laying P.C.C M-150 with nominal mix of (1:2:4) in foundation do-do all complete as per building specification and direction of E/I. | - | M3 | 4,598.23 | - |
| 3 | Providing and laying P.C.C M-150 with nominal mix of (1:1.5:3) in foundation do-do all complete as per building specification and direction of E/I. | - | M3 | 4,961.73 | - |
| 4 | Providing tor steel reinforcement of 12 mm dia bar do-do all complete as per building specification and direction of E/I. | - | mt | 80,879.07 | - |
| 5 | Stone masonary work in CM 1:3 IN FOUNDATION all complete as per building specification and direction of E/I. | - | M3 | 3,458.6 | - |
| 6 | Stone masonary work in CM 1:3 IN SUPERSTRUCTURE all complete as per building specification and direction of E/I. | - | M3 | 3,468.8 | - |
| 7 | Providing 25mm. Thick cement plaster (1:3) with clean caorse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | - | M2 | 100.8 | - |
| 8 | Supply of hume pipe .............E/I. 600 mm dia. NP2 (Part B Page-71 M-300 SL-10.7 ) | - | M | 1,264.45 | - |
| 9 | Labour for laying, fitting and fixing NP2 hume pipe in line, level and grade, as well as providing approved jointing materials and joints properly filled to make them water proof, all complete as per specification and direction of E/I. | - | M | 646.96 | - |
| 10 | Earth Work in Filling foundation trenches or back filling of masonary structure .............. with 30 m Lead all complete as per direction of E/I. | 1 | M3 | 114.5 | ₹114.39 |
stage.html
html • 0.03 MB
finance_155703.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.32 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Sbd_1.pdf
Tender Documents • 0.91 MB
BOQ_155703.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .