Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹1.6 CrAccepted-Finance 11 13 7 TASKAND ROAD CIVIL LINES PRAYAGRAJ | ₹1.6 Cr | L2 | Accepted-Finance Accept |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualify |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualify |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
24 Jul 2026, 3:00 pmClosed
General Manager Zone-3 UPPCL Lucknow
Office of the General Manager Zone-3 UPPCL Lucknow
PROPOSED UPGRADATION OF GOVERNMENT HIGH SCHOOL AT SARME, BLOCK - JAMO, DISTRICT - AMETHI (U.P.).
2026_UPPRC_1168359_1
22/GM-3/UPPCL/2026-27 DATE-10.07.2026
Open Tender
Civil Works - Buildings
Percentage
270 days
Amethi
As per Bid Documents
2 documents required · 2 mandatory
₹17,700
₹3.3 L
11 Aug 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MAIN BUILDING (CIVIL WORK)
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 1 | CUM | 1 | ₹1 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1 | CUM | - | - |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 1 | CUM | 1 | ₹1 |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | CUM | - | - |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground. floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm | - | - | - | - |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1 | SQM | - | - |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Concrete of M25 grade with minimum cement content of 330 kg /cum
Up to plinth level | - | - | - | - |
| 8 | PLINTH BAND | - | CUM | - | - |
| 9 | R.C.C. WORK IN FOOTING | - | CUM | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Concrete of M25 grade with minimum cement content of 330 kg /cum
Above plinth level | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BID_DOC.pdf
Tender Documents • 13.80 MB
BOQ_2191500.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].