Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.2 LAdmitted-Fee/PreQual/Technical/Finance BIRAJPUR JARMUNDI DUMKA | DUMKA | JHARKHAND | 814101 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹20.1 L+₹93,119.95 (4.86%)Admitted-Fee/PreQual/Technical/Finance DUGARIYA DUMKA | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹20.3 L+₹1.1 L (5.73%)Admitted-Fee/PreQual/Technical/Finance GRAM CHANDRAPUR PO FAKIRHARI JASHUPURDISTRICT JASHUPUR DISTRICT DUMKA | DUMKA | JHARKHAND | 814101 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹22.1 L+₹2.9 L (15.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹22.4 L+₹3.2 L (16.9%)Admitted-Fee/PreQual/Technical/Finance NAWADIH DUMKA JHARKHAND | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
18 Apr 2026, 5:00 pmClosed
Executive Engineer, Rural Works Department
Executive Engineer, Samaharnalay Bhawan, Block-C, 2nd Floor, Dumka 814101
Construction of Road RCC Culvert (Size-2x5.0x2.5m) with both side Approach Road at Saraipani Joriya in REO Road Saraipani,Village-Saraipani
2026_RWD_112543_1
05/25-26/RWD/EE/DUMKA
Open Tender
Civil Works
Percentage
150 days
DUMKA
Please Refer tender documents
4 documents required · 4 mandatory
₹5,000
₹64,000
20 Apr 2026
8 Apr 2026
20 Apr 2026
8 Apr 2026
18 Apr 2026
8 Apr 2026
8 Apr 2026 - 18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres by mechanical means (Cement Concrete Grade M-15 & M-20). | - | M3 | - | - |
| - | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location within all lifts and lead up to 1000 m. | - | M3 | - | - |
| - | Compaction of original ground supporting subgrade (loosening of the ground up to a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for subgrade construction). | - | M3 | - | - |
| - | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix-in-place method with front end loader at OMC and compacting with vibratory roller to achieve desired density complete as per Clause 401 | - | M3 | - | - |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | - | M3 | - | - |
| - | Construction of un-reinforced dowel jointed plain cement concrete pavement over prepared sub-base including polythene film, formwork, compaction with vibrators, contraction and expansion joints and curing of concrete slabs for 14 days. | - | M3 | - | - |
| - | Earth work in excavation of foundation of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling. | - | M3 | - | - |
| - | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506. | - | M3 | - | - |
| - | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15). | - | M3 | - | - |
| - | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications – square rubble coursed masonry (first sort). | - | M3 | - | - |
stage.html
html • 0.03 MB
finance_151954.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.45 MB
sbdnw.pdf
Tender Documents • 1.56 MB
BOQ_151954.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .