Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
5 Feb 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Replacement of tillted pole, line etc in area of EDSD-Anwarpur of EDD-II Hapur
2024_PVVNL_885665_1
114(W)/EDCH/2023-24
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹2,000
6 Feb 2024
25 Jan 2024
5 Feb 2024
25 Jan 2024
5 Feb 2024
25 Jan 2024
Amount
FOR REPLACEMENT OF TILTED POLS, LINES & ATTENDDING BREAKDOWN ETC. (RUNNING CONTRACT) IN THE AREA OF EDSD-ANWARPUR (UBARPUR) OF EDD-II HAPUR, UNDER EDC., HAPUR.
Carriage of line material (like 11KV XLPE Cable 3x35-3x70+3x120-3x185sqmm, and 33KV XLPE Cable 3x185/240/300 Sqmm and LT Abc etc.) from JE Store/Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5mtrs long support from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of ST Pole 11mtrs long support from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Erection & Fixing of PCC Pole 8.5 mtr. long in LT. line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing L.T. Pin Clamps, M.S. Flat of size 50x6 & Schacle Insulator of size 75x90mm, with proper size nuts and bolts.
Erection & Fixing of PCC Pole 8.5 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & Fixing of ST. Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & Fixing of ST. Pole 11 mtr. long in 33 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Grouting of following STP Pole supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Laying of following XLPE Cable after digging of earth for making trench by providing good quality brick at three sides of cable and filling of soil and sand in cable trench, including cost of all required material and labour etc. spare cable shall be left in the loop shape at both ends.
3x35-3x70+3x120-3x185sqmm 11KV XLPE Cable
3x185/240/300 Sqmm 33KV XLPE Cable.
Dismantling & removal of existing ACSR Conductor and opening of all accessories and bundling the same at various places.
Stringging, Saggging of old loose ACSR Conductor and binding from insulator & proper completion of work as per RESPO/Drawing Norms.
ABC Conductor
ACSR Weasel Conductor
ACSR Rabbit Conductor
ACSR Dog Conductor
Re-straightening of Tilted Pole after digging of pit of suitable size adjustment of ST/P.C.C Poles as per RESPO/Drawing Norms.
Dismantling & Removal of old and used STP (Scrap)/PCC Pole, after digging of pit of suitable size and removal of all accessoires as per RESPO/Drawing Norms.
Laying Stringging & Final Saggging of ACSR Conductor and binding from insulator & proper completion of work as per RESPO/Drawing Norms.
ABC Conductor
ACSR Weasel Conductor
ACSR Rabbit Conductor
ACSR Dog Conductor
Carriage of old & damaged STP Scrap/PCC Pole, from site of work to JE Store/Electricity Store Centre Hapur including loading and unloading at both the ends on Kachha and Packka road.,
Carriage of old & damaged scrap ABC/Acsr Conductor, from site of work to Electricity Store Centre Hapur including loading and unloading at both the ends on Kachha and Packka road.,
Jumpering work properly as per RESPO/Norms.
Singh Heavy Electricals
D S CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .