Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance | ₹7.4 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 LAdmitted-Finance | ₹8.3 L | L2 | Admitted-Finance |
| 3 | L3₹8.3 LAdmitted-Finance | ₹8.3 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹84,264
Closing Date
12 Jan 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Hariparvat Zone, Ward No. 48, Moti Lal Nehru, Ghatiya Azam Khan Construction of the boundary wall of Valmiki Vatika.
2025_DOLBU_1102119_1
24/12/2025/NAGAR NIGAM AGRA/12-01-2026/64
Open Tender
Construction Works
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹84,264
21 Feb 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1)
Earth work in Filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per cum. (Chapter No.4 PWD.SCH.-253(a)+ CPTR No. 3 1 to 8 Km.)
Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1)
Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2)
Class-150 brick work in 1:4 cement and coarse sand, mortar in Super Structrure including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapte No. 06 S.I. No. 2+5)
12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 Cement : 4 Coarse sand. (Chapter No.13 Si.No.582(ii))
Finishing Wall Putty Aproved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all material. (15-Chapter Si.No.27 New)
Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 Itr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) supply of all labour material and T&P required for proper completion of work. (Chapter No.15 Si.No.17)
RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 in raft foundation (1cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand ;3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including the cost of centering, shuttering, finishing exlcuding reinforcement, with 1:1.5:3 in heavier beam (1 cement: 1.5 coarse sand(zone-lll) : 3 graded stone).
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor. (Chapter No. 10 S.I. No. 504(B))
Kota stone slab flooring over 20 mm (average) thick base laid over and joined with gray cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 coarse sand) :25 mm thick. (Chapter No.14 Si.No.12-11.26.1)
Providing and Fixing close timbering in trenches on Both Side & all complete. (a) 0.00 To 3.00 M. (None Scheduled)
Sub Total (A)
Add / Deduction For Estimate Figure Amount Match
Grand Total
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.06 MB
BOQ_2032989.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid