Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance NO 36 KALAIVANAR STREET BHARATHI NAGAR MINJUR 601 203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | L1 | Accepted-Finance L1 BIDDER | |
| 2 | L2₹3.1 L+₹13,998 (4.74%)Accepted-Finance NO 87 NEW BALAJI NAGAR ATTIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L2 | Accepted-Finance L2 BIDDER |
Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
19 Jun 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SEES NCTPS-II
OFFICE OF SEES NCTPS-II
Sp. 26 NCTPSII ES circle CI Division TG EAST subdivision Unit II Carrying out Annual overhaul maintenance activities of 600MW Main Turbine sensors and Inner bearing thermocouples in pedestal 1 to 8 and CI equipments in EAST allied areas.
2024_EB_451780_1
SE ES NCTPS II CI SPEC NO 26 24to24
Open Tender
Electrical and Maintenance Works
Works
45 days
NCTPS-II
AS PER TENDER SPECIFICATION
2 documents required · 2 mandatory
₹0
₹3,400
Yes
24 Jun 2024
12 Jun 2024
20 Jun 2024
12 Jun 2024
19 Jun 2024
12 Jun 2024
Amount
Charges for Complete dismantling, cleaning, refixing, sensor alignment & Gap voltage adjustment and Dressing of 600MW Main Turbine Shaft Vibration sensors, Bearing vibration sensors, Axial shift sensors, Rotor expansion sensors, Key Phasor, Casing Expansion Sensors & Speed Sensors in Pedestal 1 to 8.
Charges for Complete dismantling, cleaning, refixing and dressing of all types of 600MW Main Turbine Triplex Type Inner Bearing Thermocouples in Pedestal 1 to 8.
Charges for Complete Overhauling of Oil Temperature Control Valve (OTCV) Actuator in Main Turbine Lube Oil and HPCF System which includes 1) Removing, Cleaning, Overhauling & Refixing of Actuator Motor Drive shaft assembly. 2) Cleaning & Overhauling of Drive of Torque Limit Device & Limit Switch Mechanism Assembly and reconditioning the Limit Switch Mechanism assembly if needed. 3) Setting of Open/Close Torque Limit Device Switches. 4) Setting of Open/Close Travel Limit Switches by adjusting the cam discs. 5) Checking the Control & Power circuit tightness in actuator terminal block. 6) Checking the Manual Operation of Actuator & Remote Operation from DCS.
Charges for complete removing, cleaning and refixing of RTDs in TDBFP and Vacuum Pump areas.
Charges for Complete Overhauling of MCV & ACV I/H Converter in TDBFP Governing system which includes 1) Releasing of I/H Converter from the governing rack. 2) Complete Dismantling and cleaning of pilot valve in the I/H Converter. 3) Replacing of Seal Kits in the I/H Converter. 4) Reassembling & refixing of I/H Converter in TDBFP Governing Rack. 5) Zero/Span Adjustment & calibration of I/H converter. 6) Checking of Governing Characteristics of I/H Converter.
Charges for complete servicing of Pneumatic Actuators in all Vacuum Pumps which includes 1) Removing of accessories in Pneumatic Actuator of vacuum pumps. 2) Complete Dismantling & Servicing of Pnuematic Actuators. 3) Replacing of Defective seals in Pneumatic Actuators. 4) Reassembling & Refixing of Pneumatic Actuators and its accessories. 5) Setting of Open/Close Travel Limit Switches by adjusting the cam discs. 6) Checking the Manual Operation of Pneumatic Actuator & Remote Operation from DCS.
Charges for complete dismantling of TDBFP Recirculation Valve actuator for servicing.
Charges for Cleaning and servicing the TDBFP Recirculation Valve upper actuator box parts which includes Membrane plate, Spindle, Bush, Driver pad, spring centring sheet, Pressure spring and replacing the worn-out diaphragms & Seal kits.
Charges for Cleaning and servicing the TDBFP Recirculation Valve lower actuator box parts which includes Adaptor, Sleeve bearing, Disk, Rod seal, Membrane plate, Spindle, Bush, Driver pad, spring centring sheet, Pressure spring and replacing the worn-out diaphragms & Seal kits.
Charges for reassembling the TDBFP Recirculation Valve actuator parts, Replacing the defective manual gearbox assembly, calibrating the actuator for proper stroke length to match valve movement for actuator and Checking the Manual Operation of Pneumatic Actuator & Remote Operation from DCS.
A.R.C.ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .