| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non Responsive |
| Sl No | Description | Qty | Unit | M P KHAITAN L1 |
|---|---|---|---|---|
| 1.00BOTANICAL GARDEN : Civil & Allied Works | ||||
| 1.00EARTH WORKS | ||||
| 1.00 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific
permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 944 | sqm | 10 ₹9,440 Lowest |
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the
bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 909 | cum | 200 ₹1,81,800 Lowest |
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring
shoring. | 713 | cum | 300 ₹2,13,900 Lowest |
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as
necessary | 13 | cum | 600 ₹7,800 Lowest |
| 1.01 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. | 218 | cum | 110 ₹23,980 Lowest |
| 1.01 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(iii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km including the cost of carried earth. | 1,292 | cum | 900 ₹11,62,800 Lowest |
| 1.01 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating
the same by thorough saturation with water, ramming complete including the cost of supply of sand.
(payment to be made on measurement of finished quantity) | 966 | cum | 1,500 ₹14,49,000 Lowest |
| 1.01 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou
bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m. | 327 | Sqm | 3,800 ₹12,42,600 Lowest |
Tender Value
₹5.5 Cr
EMD Value
₹11.0 L
Closing Date
22 Jan 2026, 3:00 pmClosed
Project Director
Office of WBTIDCLtd. C.S.T.C. Kasba Depot Compound Kolkata-700107
Design, Structural Vetting and Construction of Search and Rescue Centres and Command and Control Centre Sl 05
2025_WBTID_977263_5
IN-WBTIDCL-529368-CW-RFB
Open Tender
Miscellaneous Works
Lump-sum
300 days
Kolkata
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11.0 L
Office of WBTIDCLtd
6 Mar 2026
23 Dec 2025
22 Jan 2026
23 Dec 2025
22 Jan 2026
6 Jan 2026
30 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOTANICAL GARDEN : Civil & Allied Works | |||||
| 1.001 | EARTH WORKS | - | - | - | - |
| 1.002 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific
permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | - | sqm | 11 | - |
| 1.003 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the
bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | - | cum | 119.27 | - |
| 1.004 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring
shoring. | - | cum | 192.38 | - |
| 1.005 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as
necessary | - | cum | 234.7 | - |
| 1.006 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. | - | cum | 77.54 | - |
| 1.007 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(iii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km including the cost of carried earth. | - | cum | 399.01 | - |
| 1.008 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating
the same by thorough saturation with water, ramming complete including the cost of supply of sand.
(payment to be made on measurement of finished quantity) | - | cum | 936.21 | - |
| 1.009 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou
bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m. | - | Sqm | 386 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.81 MB
BOQ_2381234.xls
BOQ • 0.65 MB
BotanicalGarden.pdf
Additional Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].