| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.3 LAccepted-AOC | 1 | Accepted-AOC lowest price | |
| 2 | 2₹14.4 L+₹15,593.80 (1.09%)Rejected-Finance 10 4 D 104 ADDAGUTTA EAST MARREDPALLI SECUNDERABAD HYDERABAD TELANGANA 500026 | HYDERABAD | TELANGANA | 500026 | 2 | Rejected-Finance highest price |
| Sl No | Description | Qty | Unit | MUTHUKUMAR A L1 | SRINIVASA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00construction | |||||
| 1.01 | Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with sma | 227 | Cum | 197 ₹44,719 Lowest | 199 ₹45,173 |
| 1.02 | Plain Cement Concrete 1:4:8 (One Part of cement, Four Part of sand, and Eight Part of Aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and cu | 38 | Cum | 5,555 ₹2,11,090 Lowest | 5,560 ₹2,11,280 |
| 1.03 | Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side walls including cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete. as pe | 720 | Sqm | 575 ₹4,14,000 Lowest | 590 ₹4,24,800 |
| 1.04 | Vibrated Plain Cement Concrete 1:2:4 (One Part of cement, Two Part of sand, Four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting an | 83 | Cum | 6,988 ₹5,80,004 Lowest | 6,998 ₹5,80,834 |
| 1.05 | Granolythic Floor finishing with PCC 1:2:4 mix using 10 to 12 mm Chips 25 mm tk including mixing and finishing to a well smoothened surface, watering cost and conveyance all materials and all labour and other incidental charges and other incidental charg | 180 | Sqm | 158 ₹28,440 Lowest | 158 ₹28,440 Lowest |
| 1.06 | Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists o | 36 | Sqm | 937 ₹33,732 Lowest | 937 ₹33,732 Lowest |
| 2.00 | Vibrated Reinforced Cement Concrete 1:1.5:3 mix,(one part of cement, one and half part of sand and three part of aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, | 6 | Cum | 8,636 ₹51,816 Lowest | 8,636 ₹51,816 Lowest |
| 2.01 | Supply and fabrication of steel using TMT rods for all Reinforced cement concrete works including cost and conveyance of all materials and all labour charges for cutting, bending and placing the rod in position and tying up the rods with binding wire an | 660 | KG | 92.97 ₹61,360.2 Lowest | 98 ₹64,680 |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
30 Sept 2025, 3:00 pmClosed
THE EXECUTIVE OFFICER, VADIPATTI TOWN PANCHAYAT
THE EXECUTIVE OFFICER, VADIPATTI TOWN PANCHAYAT
Vadipatti Town Panchayat Construction of Storm Water Drain at Ward.3 Maharani Nagar in Vadipatti Town Panchayat
2025_DTP_608256_1
198/2025
Open Tender
Civil Works
Works
90 days
VADIPATTI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,000
5 Nov 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
Amount
construction
Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with sma
Plain Cement Concrete 1:4:8 (One Part of cement, Four Part of sand, and Eight Part of Aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and cu
Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side walls including cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete. as pe
Vibrated Plain Cement Concrete 1:2:4 (One Part of cement, Two Part of sand, Four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting an
Granolythic Floor finishing with PCC 1:2:4 mix using 10 to 12 mm Chips 25 mm tk including mixing and finishing to a well smoothened surface, watering cost and conveyance all materials and all labour and other incidental charges and other incidental charg
Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists o
Vibrated Reinforced Cement Concrete 1:1.5:3 mix,(one part of cement, one and half part of sand and three part of aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing,
Supply and fabrication of steel using TMT rods for all Reinforced cement concrete works including cost and conveyance of all materials and all labour charges for cutting, bending and placing the rod in position and tying up the rods with binding wire an
SRINIVASA ENTERPRISES (BID ID -1476316)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_726934.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .