| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.8 CrAccepted-AOC HOUSE OF RAJ KUMAR GOEL PO MATELLI MATELLI BAZAR JALPAIGURI | MATELLI BAZAR | JALPAIGURI | WEST BENGAL | ₹6.8 Cr | L-1 | Accepted-AOC L-1 Bidder. |
| 2 | L-2₹7.1 Cr+₹33.3 L (4.89%)Rejected-Finance OFFICE NO 304 305 3RD FLOOR PLOT NO 1 USHA CHAMBERS L S C NEW RAJDHANI ENCLAVE DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | ₹7.1 Cr+₹33.3 L (4.89%) | L-2 | Rejected-Finance Rejected. Other than L-1. |
| 3 | L-3₹7.5 Cr+₹69.7 L (10.2%)Rejected-Finance | ₹7.5 Cr+₹69.7 L (10.2%) | L-3 | Rejected-Finance Rejected. Other than L-1. |
| 4 | L-4₹7.9 Cr+₹1.1 Cr (15.5%)Rejected-Finance | ₹7.9 Cr+₹1.1 Cr (15.5%) | L-4 | Rejected-Finance Rejected. Other than L-1. |
| 5 | L-5₹12.4 Cr+₹5.6 Cr (81.7%)Rejected-Finance SITANI BUILDING DINBAZAR JALPAIGURI 735101 | JALPAIGURI | JALPAIGURI | WEST BENGAL | 735101 | ₹12.4 Cr+₹5.6 Cr (81.7%) | L-5 | Rejected-Finance Rejected. Other than L-1. |
| Sl No | Description | Qty | Unit | G and G Infratech Private Limited L2 | ANUGRAH CONSTRUCTION PVT. LTD. L1 | M.P. SITANI AND SONS L5 | DOOARS CONSTRUCTION COMPANY L4 | M/S. S.K. TEKRIWAL L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00BUILDINGS & STRUCTURE (Sch 'A' PART-I) | ||||||||
| 1.01 | Lump sum price worked out by the Contractor for “Design, Construction, Fabrication and Erection of SHOPPING COMPLEX including RCC LIFT WELL & RCC TERRACE TANK of capacity 20000Ltr : SHOPPING COMPLEX incorporating RCC framed as well as LGSF (Light Gauge Steel Frame) Structure Technology on the basis of conceptual / Line Plan drawings all as specified and shown on drawing, DBR and other documents of the Tender and as mentioned in Annexure I to this Schedule shall be submitted by the contractor alongwith Soil Investigation complete duly vetted by IIT/NIT & approved by the Department. ” as listed in Schedule ‘A’ Part-I.
NOTE: SCHEDULE 'A' PART I (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amoun in the Green coloured field under Col-6 only. | 1 | COMPLETE JOB | 5,64,00,064 ₹5,64,00,064 | 5,50,00,000 ₹5,50,00,000 Lowest | 10,91,73,007 ₹10,91,73,007 | 6,37,30,513 ₹6,37,30,513 | 6,05,00,000 ₹6,05,00,000 |
| 2.00EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | ||||||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,56,908.70 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 2,95,500 ₹2,95,500 | 1,75,000 ₹1,75,000 Lowest | 2,82,599.57 ₹2,82,599.57 | 2,50,000 ₹2,50,000 | 2,69,754.14 ₹2,69,754.14 |
| 3.00HARDSTANDING (Sch 'A' PART-III) | ||||||||
| 3.01 | Lump sum price worked out by the Contractor for “(HARDSTANDING)” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 32,74,958.85 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 39,15,790 ₹39,15,790 | 31,00,000 ₹31,00,000 Lowest | 36,02,454.74 ₹36,02,454.74 | 31,50,000 ₹31,50,000 | 36,02,454.73 ₹36,02,454.73 |
| 4.00SEWAGE DISPOSAL (Sch 'A' Part-IV) | ||||||||
| 4.01 | Lump sum price worked out by the Contractor for “(SEWAGE DISPOSAL)” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,51,223.38 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 3,22,390 ₹3,22,390 | 2,65,000 ₹2,65,000 | 2,76,345.72 ₹2,76,345.72 | 2,50,000 ₹2,50,000 Lowest | 2,81,370.18 ₹2,81,370.18 |
| 5.00AREA DRAINAGE(Sch 'A' PART-V) | ||||||||
| 5.01 | Lump sum price worked out by the Contractor for “(AREA DRAINAGE)” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 6,42,787.73 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 7,83,765 ₹7,83,765 | 6,45,000 ₹6,45,000 | 7,07,066.5 ₹7,07,066.5 | 6,35,000 ₹6,35,000 Lowest | 7,19,922.26 ₹7,19,922.26 |
Tender Value
₹8.9 Cr
EMD Value
₹7.7 L
Closing Date
7 Jan 2026, 6:00 pmClosed
CE SILIGURI ZONE
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA, DIST JALPAIGURI, PIN 734 008 (WB)
PROVISION OF SHOPPING COMPLEX AT SUKNA MILITARY STATION UNDER GE SUKNA
2025_MES_742736_1
98826/SUK/SZ/E8
Open Tender
Civil Works
Lump-sum
540 days
SUKNA
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE SUKNA
₹7.7 L
Yes
26 Mar 2026
3 Dec 2025
14 Jan 2026
3 Dec 2025
7 Jan 2026
31 Dec 2025
3 Dec 2025 - 11 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDINGS & STRUCTURE (Sch 'A' PART-I) | |||||
| 1.01 | Lump sum price worked out by the Contractor for “Design, Construction, Fabrication and Erection of SHOPPING COMPLEX including RCC LIFT WELL & RCC TERRACE TANK of capacity 20000Ltr : SHOPPING COMPLEX incorporating RCC framed as well as LGSF (Light Gauge Steel Frame) Structure Technology on the basis of conceptual / Line Plan drawings all as specified and shown on drawing, DBR and other documents of the Tender and as mentioned in Annexure I to this Schedule shall be submitted by the contractor alongwith Soil Investigation complete duly vetted by IIT/NIT & approved by the Department. ” as listed in Schedule ‘A’ Part-I.
NOTE: SCHEDULE 'A' PART I (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amoun in the Green coloured field under Col-6 only. | 1 | COMPLETE JOB | - | - |
| 2EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT (Sch 'A' PART-II) | |||||
| 2.01 | Lump sum price worked out by the Contractor for “EARTHWORK, SITE CLEARANCE AND SITE DEVELOPMENT” as listed in Schedule ‘A’ Part-II.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,56,908.70 inserted by the MES in Schedule ‘A’ Part-II. | 1 | LUMP SUM | 2,56,908.7 | ₹2,56,908.7 |
| 3HARDSTANDING (Sch 'A' PART-III) | |||||
| 3.01 | Lump sum price worked out by the Contractor for “(HARDSTANDING)” as listed in Schedule ‘A’ Part-III.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 32,74,958.85 inserted by the MES in Schedule ‘A’ Part-III. | 1 | LUMP SUM | 32,74,958.85 | ₹32,74,958.85 |
| 4SEWAGE DISPOSAL (Sch 'A' Part-IV) | |||||
| 4.01 | Lump sum price worked out by the Contractor for “(SEWAGE DISPOSAL)” as listed in Schedule ‘A’ Part-IV.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 2,51,223.38 inserted by the MES in Schedule ‘A’ Part-IV. | 1 | LUMP SUM | 2,51,223.38 | ₹2,51,223.38 |
| 5AREA DRAINAGE(Sch 'A' PART-V) | |||||
| 5.01 | Lump sum price worked out by the Contractor for “(AREA DRAINAGE)” as listed in Schedule ‘A’ Part-V.
Representing ** ___ % ______ percent *Above / Below the lump sum price of Rs. 6,42,787.73 inserted by the MES in Schedule ‘A’ Part-V. | 1 | LUMP SUM | 6,42,787.73 | ₹6,42,787.73 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Complete_Tender_Except_BOQ.pdf
Tender Documents • 10.51 MB
BOQ_831720.xls
BOQ • 0.32 MB
Drgs.rar
Additional Documents • 21.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .