Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | -37.79% | ₹6.1 L | L1 | Admitted-Finance |
| 2 | L2₹6.5 LAdmitted-Finance | -32.99% | ₹6.5 L | L2 | Admitted-Finance |
| 3 | L3₹6.6 LAdmitted-Finance | -32.60% | ₹6.6 L | L3 | Admitted-Finance |
| 4 | L4₹7.0 LAdmitted-Finance | -28.41% | ₹7.0 L | L4 | Admitted-Finance |
| 5 | L5₹7.1 LAdmitted-Finance | -27.20% | ₹7.1 L | L5 | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹19,600
Closing Date
3 Aug 2026, 6:00 pmClosed
Ex. Engineer
Jal Shakti (PHE) Division Doda
Providing Laying and Fitting of Gravity main and Distribution Network for Shiekh Mohalla Malothi Bhalla under District Capex Budget 2026-27 (JKSSR 2022)
2026_PHE_317201_1
e-NIT No. EE/JS(PHE)D/D/09 of 07/2026-27
Open Tender
Civil Works
Percentage
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Ex. Engineer
₹19,600
13 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by Engineer incharge in all kind of soil. | 270.1 | Cum | 479.3 | ₹1,29,458.93 |
| 2 | Earth work in excavation by manual means over areas (exceeding 30cm and upto 1.5mtr in width as well as 10 Sqm on plan) including disposal of excavated earth upto 1mtr. for cutting edge, disposed earth to be levelled & neately dressed in all kind of soil. | 42.75 | Cum | 576.45 | ₹24,643.24 |
| 3 | Providing & laying in position cement concrete of specified grade excluding the cost of centring & shuttering all work upto plinth level in 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggr. 40mm nominal size. | 4.12 | Cum | 5,202.9 | ₹21,435.95 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1.71 | Cum | 7,788.4 | ₹13,318.16 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 3.41 | Cum | 9,395.7 | ₹32,039.34 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 0.65 | Cum | 9,821.5 | ₹6,383.98 |
| 7 | Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with:1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 0.77 | Cum | 10,377.15 | ₹7,990.41 |
| 8 | Steel Reinforcement for RCC work incl. straighening, cutting, bending, placing in position & binding all complete upto plinth level TMT bars.Fe 500. | 530 | Kg. | 123.2 | ₹65,296 |
| 9 | Centring and shuttering including strutting, propping etc.and removal of form work for foundation, footings, bares of column etc. for mass concrete. | 1.7 | Sqm. | 286.35 | ₹486.8 |
| 10 | Centring and shuttering including strutting, propping etc.and removal of form work for in walls (any thickness.) incl. attached pilasters, buttresses, plinth & string courses. | 68.54 | Sqm. | 628.95 | ₹43,108.23 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1038423.xls
BOQ • 0.32 MB
Corrigendum.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].