| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC NO 2 83 NORTH STREET MAYILADUTHURAI DISTRICT MYLADUTHURAI 609 003 | MAYILADUTHURAI | TAMIL NADU | 609003 | ₹1.5 Cr | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹1.6 Cr+₹12.0 L (7.91%)Rejected-Finance 92 VENKATESA GRAMANI STREET CHINTADRIPET CHENNAI 600 002 | NA | NA | 600002 | ₹1.6 Cr+₹12.0 L (7.91%) | L2 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
30 Aug 2023, 3:00 pmClosed
District Collector
Collectorate Mayiladuthurai
Strengthening of Melaiyur Alaveli Road (R-156) in sembanarkoil block (Sbkl Package No 11) Mayiladuthurai District Under MGSMT 75 2022-2023
2023_RDTN_358919_1
4436/TENDER/2023 dt 08.08.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Sembanarkoil
Refer Tender Document
10 documents required · 10 mandatory
₹0
₹1.5 L
Yes
16 Dec 2024
14 Aug 2023
30 Aug 2023
14 Aug 2023
30 Aug 2023
14 Aug 2023
Amount
Strenthening Of Road to Melaiyur Alaveli Road (R-156)0/0-3/800 @Melaiyur Panchayat
Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc
Side Berms
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and convey
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 c
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for ,Km stone,
Provision for Name board
Provision for 60 cm Equilateral triangle (Cautionary) sign Bord
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
PREMIER CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .