Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical all Doc Acceped |
| 2 | Accepted-Technical | Accepted-Technical all Doc Acceped |
Tender Value
₹16.8 L
EMD Value
₹82,000
Closing Date
15 Apr 2026, 3:00 pmClosed
VC HPDA
HPDA PREET VIHAR HAPUR
work of strengthening room on the first floor in the SP office
2026_HPDA_1134234_1
09/se/hpda/2026
Open Tender
Civil Works
Percentage
90 days
hapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
VC HPDA
₹82,000
8 Jun 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and
stacking the material within 50 metres lead of:
15.28.1 G.S. Sheet | - | Sqm. | - | - |
| 2 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing
and false ceiling including disposal of unserviceable material and stacking
of serviceable material with in 50 meters lead as directed by Engineerin-
charge. | - | Sqm. | - | - |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled
or waste materials by mechanical means, including loading, transporting,
unloading to approved municipal dumping ground or as approved by
Engineer-in-charge, beyond 50 m initial lead, for all leads including all
lifts involved. | - | Cum. | - | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum. | - | - |
| 5 | Centering and shuttering including strutting, propping etc, and removal of form forSuspended floors, roofs, landings, balconies and access platform | - | Sqm. | - | - |
| 6 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm. | - | - |
| 7 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm. | - | - |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.
Mild steel and Medium Tensile steel bars. | - | kg | - | - |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in super structure and plinth in:
6.4.1 Cement mortar 1:4 (1 cement: 4 coarse sand) | 22.67 | Cum. | 6,314.79 | ₹1,43,156.29 |
| 10 | 12 mm cement plaster of mix :
1:4 (1 cement: 4 coarse sand) | 307.32 | Sqm. | 265.1 | ₹81,470.53 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_2117396.xls
BOQ • 0.35 MB
T2.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .