Executive Engineer PWD(RandB) Division Satwari
Office of the Executive Engineer PWD(RandB) Division Satwari
Blacktopping of road from santra mohr to Gho manhasan
2025_PWDJK_298037_1
Short e-NIT No. 87 of 2025-26 Dated 12-12-2025
Open Tender
Civil Works
Percentage
30 days
Marh
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹86,240
Satwari
13 Feb 2026
12 Dec 2025
23 Dec 2025
12 Dec 2025
22 Dec 2025
12 Dec 2025
16 Dec 2025
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge (incl. all leads, lifts and carriage complete) (IN PATCHES AND STRETCHES)
Providing and applying tack coat using hot straight bitumen of grade VG-30 inclu. heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaninig the ex. Road surface as per specification on WBM surface surface @0.750 kg /sqm
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness withbitumen ofgrade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity
Providing and applying tack coat using hot straight bitumen of grade VG-30 inclu. heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaninig the ex. Road surface as per specification on Bitumen surface @0.50 kg /sqm
Providing and laying 25 mm Thick Semi- Dense Bituminous Concrete compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge in all kinds of soil
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 aggregate 40mm nominal size
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.Non-pressure NP-3 class (Medium duty) R.C.C. pipes 450 mm dia. R.C.C. pipe
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases for columns etc. for mass concrete.
Carriage of sand within an avg. lead 10 KM MT
Carriage of Stone Aggregate within an avg. lead 10 KM MT
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_965917.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .