Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,898Admitted-Finance BHAGAT SINGH COLONY WARD NO 9 MORWA SINGRAULI DIST SINGRAULI M P 486889 | SINGRAULI | SINGRAULI | M P | 486889 | ₹44,898 | L1 | Admitted-Finance |
| 2 | L2₹49,786.05Admitted-Finance | ₹49,786.05 | L2 | Admitted-Finance |
| 3 | L3₹62,571Admitted-Finance | ₹62,571 | L3 | Admitted-Finance |
| 4 | L4₹64,863Admitted-Finance KOTA BASTI SHAKTINAGAR P O SHAKTINAGAR DISTT SONBHADRA U P 231222 | SONBHADRA | UTTAR PRADESH | 231222 | ₹64,863 | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOTI ENGINEERING WORKS L4 | MEENA ENGINEERING L3 | M/S NATIONAL ASSOCIATES L2 | NIRBHAY SALES AND SUPPLY AGENCY L1 |
|---|---|---|---|---|---|---|---|
| 1.00Work of repairing of A-frame housing in 03 nos. CAT 777E Dumpers of Krishnashila Project. | |||||||
| 1.10 | Labour charge including contractor's profit (exclusive GST ) for Dismantling and assembling of “A” Frame , Welding and Boring over worn out housing and collar . Dismantling includes demounting of diesel tank , removal of master cylinder and all connected hoses , removal of transmission and hydraulic hoses near A frame area required to perform the work , De-torque A frame cup and pin bolts , removal of A-frame pin and bearing /bush . Assembling includes fitting of A-frame pin and bearing /bush , torque A-frame cup and pin bolts ,connection of all the hoses removed during dismantling , fitment of master cylinder and mounting of diesel tank and all connection | 3 | job | 4,640 ₹13,920 | 7,200 ₹21,600 | 3,640.35 ₹10,921.05 | 1,186 ₹3,558 |
| 1.20 | Total Cost (exclusive GST ) of undercut of collar portion at site (@50.00 cm3 per job ) | 150 | Cubic cm | 59 ₹8,850 | 44 ₹6,600 | 45 ₹6,750 | 50 ₹7,500 |
| 1.30 | Total Cost (exclusive GST ) of undercut of bearing seat at site (@64.00 cm3 per job ) | 192 | Cubic cm | 59 ₹11,328 | 44 ₹8,448 | 45 ₹8,640 | 50 ₹9,600 |
| 1.40 | Total Cost (exclusive GST ) of final machining of collar portion at site (@50.00 cm3 per job ) | 150 | Cubic cm | 59 ₹8,850 | 44 ₹6,600 | 45 ₹6,750 | 50 ₹7,500 |
| 1.50 | Total Cost (exclusive GST ) of final machining of bearing seat at site (@95.00 cm3 per job ) | 285 | Cubic cm | 59 ₹16,815 | 44 ₹12,540 | 45 ₹12,825 | 50 ₹14,250 |
| 1.60 | Hiring charge of welding machine (exclusive GST ) (@3 days per job ) | 9 | Days | 200 ₹1,800 | 44 ₹396 | 300 ₹2,700 | 110 ₹990 |
| 1.70 | Hiring charge of 02 no. Grinding machine (exclusive GST ) (straight & angle ) ( @3 days per job ) | 9 | Days | 200 ₹1,800 | 43 ₹387 | 100 ₹900 | 100 ₹900 |
| 1.80 | Total cost (exclusive GST ) for consumables like holder , emery paper etc | 3 | job | 500 ₹1,500 | 2,000 ₹6,000 | 100 ₹300 | 200 ₹600 |
| 2.00Note- Electric power supply, industrial gases and welding electrodes will be provided by NCL. | |||||||
Tender Value
₹76,722
EMD Value
₹1,000
Closing Date
16 Feb 2026, 4:00 pmClosed
Staff Officer (EXCV), KSL Project
Excavation department , GM Office , Krishnashila Area
Offloading the work of re-pairing of A-frame housing in 03 nos. CAT 777E Dumpers of Krishnashila Project.
2026_NCL_352504_1
KSL/SO (Excv.)/E_Tender/25-26/20 DTD-05.02.2026
Open Tender
Excavation Department Work
365 days
Workshop (Excavation, KSL Project
Please refer tender documents
5 documents required · 5 mandatory
₹1,000
13 Mar 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
16 Feb 2026
7 Feb 2026
6 Feb 2026 - 12 Feb 2026
Work of repairing of A-frame housing in 03 nos. CAT 777E Dumpers of Krishnashila Project.
Labour charge including contractor's profit (exclusive GST ) for Dismantling and assembling of “A” Frame , Welding and Boring over worn out housing and collar . Dismantling includes demounting of diesel tank , removal of master cylinder and all connected hoses , removal of transmission and hydraulic hoses near A frame area required to perform the work , De-torque A frame cup and pin bolts , removal of A-frame pin and bearing /bush . Assembling includes fitting of A-frame pin and bearing /bush , torque A-frame cup and pin bolts ,connection of all the hoses removed during dismantling , fitment of master cylinder and mounting of diesel tank and all connection
Total Cost (exclusive GST ) of undercut of collar portion at site (@50.00 cm3 per job )
Total Cost (exclusive GST ) of undercut of bearing seat at site (@64.00 cm3 per job )
Total Cost (exclusive GST ) of final machining of collar portion at site (@50.00 cm3 per job )
Total Cost (exclusive GST ) of final machining of bearing seat at site (@95.00 cm3 per job )
Hiring charge of welding machine (exclusive GST ) (@3 days per job )
Hiring charge of 02 no. Grinding machine (exclusive GST ) (straight & angle ) ( @3 days per job )
Total cost (exclusive GST ) for consumables like holder , emery paper etc
Note- Electric power supply, industrial gases and welding electrodes will be provided by NCL.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.99 MB
ConditionsofContract.pdf
Tender Documents • 0.69 MB
Annexure.pdf
Tender Documents • 0.49 MB
BOQ_365299.xls
BOQ • 0.33 MB
InstructionstoBidder.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid