| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.0 LAccepted-AOC | ₹83.0 L | L1 | Accepted-AOC The work has been awarded to Manoj Kumar Samal |
| 2 | L2₹1.1 Cr+₹22.6 L (27.2%)Rejected-Finance | ₹1.1 Cr+₹22.6 L (27.2%) | L2 | Rejected-Finance Rejected Bidder |
| 3 | L2₹1.1 Cr+₹22.6 L (27.2%)Rejected-Finance | ₹1.1 Cr+₹22.6 L (27.2%) | L2 | Rejected-Finance Rejected Bidder |
| 4 | L2₹1.1 Cr+₹22.6 L (27.2%)Rejected-Finance KENDRAPARA ODISHA 754219 | KENDRAPARA | ODISHA | 754219 | ₹1.1 Cr+₹22.6 L (27.2%) | L2 | Rejected-Finance Rejected Bidder |
| 5 | L2₹1.1 Cr+₹22.6 L (27.2%)Rejected-Finance BHUBAN NAC | ₹1.1 Cr+₹22.6 L (27.2%) | L2 | Rejected-Finance Rejected Bidder |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
19 Feb 2026, 5:00 pmClosed
Chief Construction Engineer,R.W Circle KPD-JJP
O/o CCE,R.W Circle,Kendrapara-Jajpur
Construction of Building Arts Block at Derabish College in the District of Kendrapara for the year 2025-2026
2026_CERWI_125690_1
Tender online RCK- 02/26
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
Kendrapara
2 documents required · 2 mandatory
₹10,000
₹1.1 L
Yes
2 Jul 2026
7 Feb 2026
20 Feb 2026
7 Feb 2026
19 Feb 2026
7 Feb 2026
7 Feb 2026 - 19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKSEarthwork in hard soil or gravelly soil within 50m intial and 1.5 mtr intial lift including rough dressing and breaking clods to maximum 5cm to 7 cm and laying in layers not exceeding 0.3 m depth and as directed by the Engineering -in -charge . | 42.11 | cum | 276.89 | ₹11,659.84 |
| 2 | Filling in foundation & plinth with excated earth including watering and ramminig as directed by the Engineering -in -charge for 100 cum.including cost and conveyance of all materials, labour with T&P required for the work and royalties etc. complete in all respect as per direction of Engineer in charge. | 28.07 | cum | 167.23 | ₹4,694.15 |
| 3 | Removal of Excavated earth transported by mechanical means within in 5 km distance including cost and conveyance of all materials, labour with T&P required for the work and royalties etc. complete in all respect as per direction of Engineer in charge. | 14.04 | cum | 278.77 | ₹3,913.93 |
| 4 | Supplying , Filling in foundation & plinth with sand well watered & rammed in 150mm (6 inch) thick layers including watering and ramming with cost , conveyance royalty, taxes of the materials and labour T&P required for the work etc. complete as per specification and direction of Engineer In Charge. | 84.4 | cum | 658.4 | ₹55,568.96 |
| 5 | Cement concrete (1:3:6 ) using 40mm. size black hard granite C.B metal of approved quality from approved quarry in foundation and plinth including hoisting , lowering , laying in layers not exceeding 0.15 mt. in thick , compacting , watering , curing with cost, carriage, royalty, all taxes , labour &T. & P. etc. complete as per specification and direction of E.I.C. | 33.36 | cum | 6,436.92 | ₹2,14,735.65 |
| 6 | Providing Single under reamed pile foundation with RCC M25 using 12mm size black HGCB stone chips including cost of boreholes, but excluding cost of M.S. rod / TOR steel and labour charges for cutting, bending & binding of steel. AS per NBC including cost & conveyance of all 375mm dia 10 mtr pile material, labours, T&P , hire charges of all mechinaries, bentonite powder, all taxes, royaliity, labour cess etc all complete as per the direction of EIC. | 57 | nos | 12,606.84 | ₹7,18,589.88 |
| 7 | R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete as per the direction of Engineer-in-charge. Pile cap | 21.55 | cum | 7,395.41 | ₹1,59,371.09 |
| 8 | Plinth bend | 9.75 | cum | 8,265.75 | ₹80,591.06 |
| 9 | Column in S/S & Floor Beam GF | 20.87 | cum | 19,067.3 | ₹3,97,934.55 |
| 10 | FF | 16.31 | cum | 21,598.42 | ₹3,52,270.23 |
stage.html
html • 0.16 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 6.70 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_580002.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .